BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 10, 2025 at 8:00 PM

Updated September 11, 2025

Site work for a civil project in Callery, Pennsylvania. Completed plans call for site work for a water / sewer project.

The Project includes the following Work: Installation of a pre-fabricated duplex pump station with above ground valve vault, directionally drilling approximately 600 LF of 6" HPDE force main, approximately 800 LF of 4" HDPE electrical conduit, and approximately 800 LF of 2" HDPE gasservice line. Installation of approximately 600 LF of new 10" gravity sewers by open-cut. Contract includes demolition of an existing pump station, abandonment of existing sewers, and tying new force main into existing force main. Question Deadline 09/03/2025 at 4:00 PM ET Questions through Online Portal Evans City Water and Sewer Authority (ECWSA) (Owner) is requesting Bids for the construction of the following Project: Callery Pump Station Relocation Project Separate Bids will be received for the following Contracts: All bidders are hereby notified that in regard to any contract pursuant to this advertisement, businesses will be afforded full opportunity to submit bids in response to this notice and will not be subjected to discrimination on the basis of gender, race, color, creed, sex, age, physical disability or national origin in consideration for an award. Similarly the successful bidder shall in no manner discriminate against or intimidate any employee involved in the manufacture of supplies, the performance of work, or any other activity required under the contract on account of gender, race, creed or color. ECWSA reserves the right to waive any defects, errors, omissions, mistakes, informalities, to accept any bid or combination of bids that are deemed to be in the best interest of the ECWSA and to reject any or all proposals. Bid security in the form a Certified Check or Bid Bond shall be furnished with the bid in an amount not less than 10%. Owner anticipates that the Project's total bid price will be approximately $1.2 million. The Project has an expected duration of 390 days. Installation of a pre-fabricated duplex pump station with above ground valve vault, directionally drilling approximately 600 LF of 6" HPDE force main, approximately 800 LF of 4" HDPE electrical conduit, and approximately 800 LF of 2" HDPE gas service line. Installation of approximately 600 LF of new 10" gravity sewers by open-cut. Contract includes demolition of an existing pump station, abandonment of existing sewers, and tying new force main into existing force main. Estimated Contract Value: $1m - $1.251m *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Bid Results

Water / Sewer

$273,400.00

Public - City

Site Work

27

22

4

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
224
Active Projects
123
Bidding Soon
1,877
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 10, 2025

November 10, 2025

Project location map

To Be Determined, Callery, PA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.