BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 29, 2025 at 8:00 PM

Updated September 30, 2025

Site work for a water / sewer project in Fleetwood, Pennsylvania. Completed plans call for site work for a water / sewer project.

West Spruce Street Water Main Replacement This project consists of the replacement of approximately 600 linear feet of 4-in water main with 6-inch ductile iron along West Spruce Street, between South Richmond Street (SR 0662) and South Franklin Street. This project also includes 12 water services and 1 fire hydrant. Questions Due Date: Aug 20th 2025, 4:00 PM EDT Bidder shall submit all questions about the meaning or intent of the Bidding Documents via Online Portal. The Fleetwood Borough Authority hereby reserves the right, which is understood and agreed to by all bidders, to refuse and reject any or all bids submitted, and also reserves the right to waive any informality in bids received.

Award

Water / Sewer

$340,500.00

Public - City

Site Work

10

19

9

5

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
703
Active Projects
320
Bidding Soon
3,104
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 27, 2025

September 26, 2025

Project location map

W Spruce St, Fleetwood, PA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.