Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 6, 2025 at 8:00 PM
Updated October 7, 2025
Site work for a water / sewer project in Los Gatos, California. Completed plans call for site work for a water / sewer project.
Location and Description - The Project involves the replacement of a storm drain across University Avenue and associated work within the Town, as shown in Attachment A, Project Plans, incorporated herein. Time for Final Completion - The Project must be fully completed within 14 calendar days from the start date set forth in the Notice to Proceed. Town anticipates that the Work will begin on or about Monday, October 6, 2025 but the anticipated start date is provided solely for convenience and is neither certain nor binding. Questions or requests for clarifications regarding the Project, the bid procedures, or any of the Contract Documents must be submitted through the Town's bidding site and received a minimum of five (5) working days prior to the scheduled bid opening. The Bid Proposal must be accompanied by bid security of ten percent of the maximum bid amount, in the form of a cashier's or certified check made payable to Town, or a bid bond executed by a surety licensed to do business in the State of California on the Bid Bond form included with the Contract Documents. The bid security must guarantee that within ten days after Town issues the Notice of Potential Award, the successful bidder will execute the Contract and submit the payment and performance bonds, insurance certificates and endorsements, valid Certificates of Reported Compliance as required under the California Air Resources Board's In-Use Off-Road Diesel-Fueled Fleets Regulation (13 CCR 2449 et seq.) ("Off-Road Regulation"), if applicable, and any other submittals required by the Contract Documents and as specified in the Notice of Potential Award. The percentage of retention that will be withheld from progress payments is 5 %. Estimated Cost. The estimated construction cost is $80,000 - $100,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Award
Water / Sewer
$101,052.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 28, 2025
October 6, 2025
University Ave, Los Gatos, CA
Related To This Project
Los Gatos, CA
--
Los Gatos, CA
Bid Date: Sep 25 2025
Los Gatos, CA
--
Los Gatos, CA
--
Los Gatos, CA
Bid Date: Nov 20 2025
Los Gatos, CA
--
Los Gatos, CA
--
Los Gatos, CA
Bid Date: Jul 29 2025
Los Gatos, CA
--
Los Gatos, CA
Bid Date: Jul 24 2025
Los Gatos, CA
Bid Date: May 30 2025
Los Gatos, CA
Bid Date: May 30 2025
Los Gatos, CA
Bid Date: May 30 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
