BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 15, 2026 at 7:00 PM

Updated January 16, 2026

Site work and renovation of a municipal facility in Pontoon Beach, Illinois. Completed plans call for the renovation of a municipal facility; and for site work for a municipal facility.

Firms are invited to submit a sealed bid to the Madison County Mass Transit District (hereinafter Owner or MCT) for the Building 3 Bus Lift replacement project. The work consists of the removal of an existing in-ground lift, surrounding floor, and partial foundation in Service Bay 5, and installation of a new scissor lift. The project also includes the removal of an existing in-ground lift in Service Bay 3, backfilling with rock, pouring of a new concrete slab, and other work necessary to complete the improvements as specified. Municipal Meeting 12/19/2025 Anticipated notice of intent to award a contract Question Deadline 12/18/2025 at 5:00 PM CT Questions and other communications must be submitted through the Bonfire portal A. Consult with the owner and provide written approval from the Authority having jurisdiction for using public thoroughfares for haul routes and site access prior to the start of hauling activities. B. Confine construction traffic to haul routes. C. Maintain traffic and parking areas in a sound free of excavated material, construction equipment, products, mud, snow and ice. D. Maintain existing and permanent paved areas used for construction. Promptly repair breaks, potholes, low areas, standing water and other deficiencies to maintain paving and drainage in original or specified condition. A. The Contractor will be required to contract and fully coordinate a certified third-party Commissioning Authority (CxA). Costs of this to be included in General Contractors Base bid for this project. Scope of this section to be included in Base bid for this project. B. Commissioning. Commissioning is a systematic process of ensuring that all building systems perform interactively according to the design intent and the Owner's operational needs. The commissioning process shall encompass and coordinate the traditionally separate functions of system documentation, equipment startup, control system calibration, testing, adjusting and balancing, performance testing, and training. C. Commissioning during the construction phase is intended to achieve the following specific objectives according to the Contract Documents: 1. Verify applicable equipment and systems are installed according to the Owner's project requirements, manufacturer's recommendations, and industry accepted minimum standards. 2. Verify applicable equipment and systems receive adequate operational checkout by installing contractors. 3. Observe and document proper performance of equipment and systems. D. The commissioning process does not take away from or reduce the responsibility of the system designers or installing contractors to provide a finished and fully functioning product. E. Abbreviations. The following are common abbreviations that may be used in the specifications and the Commissioning Plan. 1. A/E Architects and Engineers 2. BOD Basis of Design 3. Cx Commissioning 4. CIL Construction Issues Log 5. CxA Commissioning Authority 6. CxS Commissioning Specialist 7. CM Construction Manager 8. TCC Temperature Controls Contractor 9. DB/C Design Build Contractor 10. EC Electrical Contractor 11. FOR Field Observation Report 12. FPT Functional Performance Test 13. GC General Contractor 14. IST Integrated Systems Test 15. MFR Manufacturer 16. MC Mechanical Contractor 17. O&M Operation and Maintenance 18. OPR Owner's Project Requirements 19. PC Plumbing Contractor 20. Subs Subcontractors to General 21. TAB Test, Adjust & Balance Contractor This locally funded project is located at 1 Transit Way, Pontoon Beach, Illinois. The work consists of the removal of an existing in-ground lift in service bay 5, surrounding floor, and partial foundation to replace with a new scissor lift. The project also includes the removal of an existing in-ground lift in service bay 3, backfilling with rock, pouring of a new concrete slab, and other work necessary to complete the improvements as specified.

Bid Results

Municipal

$349,031.00

Public - County

Renovation, Site Work

10

16

4

3

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
325
Active Projects
174
Bidding Soon
1,586
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 13, 2026

February 12, 2026

Project location map

1 Transit Wy, Pontoon Beach, IL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.