Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 15, 2026 at 7:00 PM
Updated January 16, 2026
Site work and renovation of a municipal facility in Pontoon Beach, Illinois. Completed plans call for the renovation of a municipal facility; and for site work for a municipal facility.
Firms are invited to submit a sealed bid to the Madison County Mass Transit District (hereinafter Owner or MCT) for the Building 3 Bus Lift replacement project. The work consists of the removal of an existing in-ground lift, surrounding floor, and partial foundation in Service Bay 5, and installation of a new scissor lift. The project also includes the removal of an existing in-ground lift in Service Bay 3, backfilling with rock, pouring of a new concrete slab, and other work necessary to complete the improvements as specified. Municipal Meeting 12/19/2025 Anticipated notice of intent to award a contract Question Deadline 12/18/2025 at 5:00 PM CT Questions and other communications must be submitted through the Bonfire portal A. Consult with the owner and provide written approval from the Authority having jurisdiction for using public thoroughfares for haul routes and site access prior to the start of hauling activities. B. Confine construction traffic to haul routes. C. Maintain traffic and parking areas in a sound free of excavated material, construction equipment, products, mud, snow and ice. D. Maintain existing and permanent paved areas used for construction. Promptly repair breaks, potholes, low areas, standing water and other deficiencies to maintain paving and drainage in original or specified condition. A. The Contractor will be required to contract and fully coordinate a certified third-party Commissioning Authority (CxA). Costs of this to be included in General Contractors Base bid for this project. Scope of this section to be included in Base bid for this project. B. Commissioning. Commissioning is a systematic process of ensuring that all building systems perform interactively according to the design intent and the Owner's operational needs. The commissioning process shall encompass and coordinate the traditionally separate functions of system documentation, equipment startup, control system calibration, testing, adjusting and balancing, performance testing, and training. C. Commissioning during the construction phase is intended to achieve the following specific objectives according to the Contract Documents: 1. Verify applicable equipment and systems are installed according to the Owner's project requirements, manufacturer's recommendations, and industry accepted minimum standards. 2. Verify applicable equipment and systems receive adequate operational checkout by installing contractors. 3. Observe and document proper performance of equipment and systems. D. The commissioning process does not take away from or reduce the responsibility of the system designers or installing contractors to provide a finished and fully functioning product. E. Abbreviations. The following are common abbreviations that may be used in the specifications and the Commissioning Plan. 1. A/E Architects and Engineers 2. BOD Basis of Design 3. Cx Commissioning 4. CIL Construction Issues Log 5. CxA Commissioning Authority 6. CxS Commissioning Specialist 7. CM Construction Manager 8. TCC Temperature Controls Contractor 9. DB/C Design Build Contractor 10. EC Electrical Contractor 11. FOR Field Observation Report 12. FPT Functional Performance Test 13. GC General Contractor 14. IST Integrated Systems Test 15. MFR Manufacturer 16. MC Mechanical Contractor 17. O&M Operation and Maintenance 18. OPR Owner's Project Requirements 19. PC Plumbing Contractor 20. Subs Subcontractors to General 21. TAB Test, Adjust & Balance Contractor This locally funded project is located at 1 Transit Way, Pontoon Beach, Illinois. The work consists of the removal of an existing in-ground lift in service bay 5, surrounding floor, and partial foundation to replace with a new scissor lift. The project also includes the removal of an existing in-ground lift in service bay 3, backfilling with rock, pouring of a new concrete slab, and other work necessary to complete the improvements as specified.
Bid Results
Municipal
$349,031.00
Public - County
Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 13, 2026
February 12, 2026
1 Transit Wy, Pontoon Beach, IL
Related To This Project
Pontoon Beach, IL
Bid Date: Nov 06 2025
Pontoon Beach, IL
Bid Date: Jan 21 2026
Pontoon Beach, IL
Bid Date: Apr 30 2026
Pontoon Beach, IL
Bid Date: Feb 10 2026
Pontoon Beach, IL
Bid Date: Jun 17 2025
Pontoon Beach, IL
--
Pontoon Beach, IL
Bid Date: Jan 23 2025
Pontoon Beach, IL
Bid Date: Dec 30 2024
Pontoon Beach, IL
--
Pontoon Beach, IL
Bid Date: Sep 17 2024
Pontoon Beach, IL
Bid Date: Jun 18 2024
Pontoon Beach, IL
Bid Date: Jun 14 2024
Pontoon Beach, IL
Bid Date: Dec 29 2023
Pontoon Beach, IL
Bid Date: Feb 15 2022
Pontoon Beach, IL
Bid Date: Feb 22 2022
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
