Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 13, 2025 at 8:00 PM
Updated October 14, 2025
Renovation of a municipal facility in Pembroke Park, Florida. Completed plans call for the renovation of a municipal facility.
Project Overview o Scope: Apply surface preparation, patching, skim coats (bonding + finish) over current cement-based stucco, replacing only localized delaminated or deteriorated areas. No full removal unless structural failure requires it. o Finish: Dense, smooth cementitious surface -- suitable for direct finish paint Site Preparation & Protection o Cover landscaping, windows, soffits, HVAC vents, paving, walkways with taped plastic sheeting or drop-cloth. o Block off any parking spots that may be susceptible to excessive dust, or debris Prep & Rough-Leveling 3.1 High-Spot Removal o Identify and grind or chip off high ridges, bulges, or rippled stucco to reduce volume of skim-coat material. 3.2 Crack & Penetration Patching o Open cracks >1/16" and back prime. Apply acrylic bonding slurry and embedded mesh tape if required. o Patch holes, gouges with polymer-modified patch compound per manufacturer instructions. Bonding/Adhesive Base Coat o Apply acrylic or polymer-modified scratch-brown coat (approx. "- 1/4 ") across elevation or localized panels. This bonds patch areas and evens feathered transitions. Smooth Finish Coat o Trowel a skim-coat of finish-grade cementitious mortar (0.04-0.08") over bonded substrate. Clean-Up & Final Touch o Remove all masking, tarps, containment, and wash down landscaping. o Joint inspection walkthrough with owner or rep. Confirm: o No visible finish defects, burn marks, voids o Substrate integrity and clean readiness for painting o Allow 24 hours to rectify any punch list items. Measurement & Payment o Bid as per-square-foot of treated surface. o Include allowances for: o Intensive high spot grinding o Crack/mop-patch work and mesh application o Define start and stop points (vertical height, details, penetration terminations, stop back requirements). Project Schedule Job Duration - Not to exceed fifteen (15) Calendar days Contractor Responsibilities o If on-site water is needed; the contractor is responsible for acquiring a temporary hydrant meter from the county or bring their own prefilled water tank. Questions must be submitted in writing to the Procurement Division at procurement@tppfl.gov no later than 5:00 PM on or before Tuesday, August 26, 2025. The Town reserves the right to waive any informality in any bid, to reject any or all bids in whole or in part, with or without cause, and/or to accept the bid that in its judgment will be in the best interest of the Town.
Award
Municipal
$89,590.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 8, 2025
October 8, 2025
3150 SW 52nd Ave, Pembroke Park, FL
Related To This Project
Pembroke Park, FL
Bid Date: Nov 13 2025
Pembroke Park, FL
Bid Date: Aug 27 2025
Pembroke Park, FL
Bid Date: Jun 25 2025
Pembroke Park, FL
--
Pembroke Park, FL
Bid Date: Apr 11 2025
Pembroke Park, FL
--
Pembroke Park, FL
Bid Date: Feb 21 2025
Pembroke Park, FL
Bid Date: Mar 17 2025
Pembroke Park, FL
Bid Date: Jan 29 2025
Pembroke Park, FL
Bid Date: Oct 03 2024
Pembroke Park, FL
Bid Date: Oct 02 2024
Pembroke Park, FL
Bid Date: May 31 2024
Pembroke Park, FL
Bid Date: Mar 21 2024
Pembroke Park, FL
--
Pembroke Park, FL
Bid Date: Aug 31 2022
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
