BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 15, 2025 at 8:00 PM

Updated August 28, 2025

Renovation of an educational facility in North Adams, Massachusetts. Completed plans call for the renovation of a educational facility.

Convert ten windows in the Feigenbaum Center for Science and Innovation Greenhouse from a gear driven system to a power actuator piston driven system. Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. Workforce Participation Goals are currently set at 6.9% for women and 15.3% for minorities.

Post-Bid

Educational

$30,000.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
385
Active Projects
224
Bidding Soon
2,537
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 27, 2025

September 15, 2025

Project location map

To Be Determined, North Adams, MA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.