BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 3, 2025 at 8:00 PM

Updated September 4, 2025

Site work for a water / sewer project in Pembroke, Massachusetts. Completed plans call for site work for a water / sewer project.

The West Elm Street and Dwelley Street Water Main Replacement project involves the replacement of approximately 9,350 linear feet of existing water main with new 10-inch ductile iron and 8-inch ductile iron water main on West Elm Street; and the replacement of approximately 2,910 linear feet of existing water main with new 10-inch ductile iron water main on Dwelley Street. The project includes water service transfers, connections to side streets, new fire hydrants, trench pavement, and full width mill and overlay. Question Deadline 08/20/2025 at 4:00 PM ET Questions to be sent via email will.schaetzke@apexcos.com

Bid Results

Water / Sewer

$3,369,218.00

Public - City

Site Work

19

18

4

Subscribe For Documents

37 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
497
Active Projects
224
Bidding Soon
3,302
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 27, 2025

October 27, 2025

Project location map

Dwelley St & W Elm St, Pembroke, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.