BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 16, 2025 at 8:00 PM

Updated September 17, 2025

Site work and paving for a civil project in Valley Center, Kansas. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

Question Deadline 08/19/2025 All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Questions received less than ten days prior to the date for opening of Bids may not be answered. The Project includes approximately 4,300 SY of Pavement, 1500 LF of water main, and Sanitary Service improvements, and erosion control located in the on Northridge Street, in Valley Center, Kansas. Paper Bids shall be on the form provided for that purpose and according to the Bidding Requirements prepared by SEH dated August 6, 2025. At this time, the City of Valley Center will not be accepting a bid where the primary or subcontractor is Conspec d/b/a Kansas Paving. Bid security in the amount of 5 percent of the Bid must accompany each Bid in accordance with the Instructions to Bidders. The Owner reserves the right to reject any and all Bids, to waive irregularities and informalities therein and to award the Contract in the best interests of the Own

Award

Roads / Highways

$589,503.00

Public - City

Paving, Site Work

36

14

2

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
59
Active Projects
37
Bidding Soon
467
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 29, 2025

September 29, 2025

Project location map

E Northridge St, Valley Center, KS

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.