Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 23, 2025 at 8:00 PM
Updated September 24, 2025
Site work and paving for a mixed-use development in Frankfort, Illinois. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.
(7.04-mile) Designed Overlay and Shoulder Reconstruction Includes (Hma) Removal Earth Excavation, Pavement Patching, Resurfacing With Hma Asphalt, Full Depth Hma Shoulder, Pavement Markings, Raised Reflective Markers, Curb and Gutter Removal and Replacement. Project Located on Us 45/52 (96th Ave / Lagrange Road) From North of Monee Manhattan Road to Wilmington Peotone Road in the Townships of Green Garden, Peotone and Wilton Center in Will County. Region 1 District 1 Federal Project # NHPPBAXK(710) County(s) Will Key Route(s) FAP 330 Section(s) 2024-981-RS State Job #(s) C-91-281-24 PPS #(s) 1-78236-1000 DBE% 0.00 VBP% 0.00 When a completion date plus working days is specified, the Contractor shall complete all contract items and safely open all roadways to traffic by 11:59 PM on October 31, 2026 except as specified herein. The Contractor will be allowed to complete all clean-up work and punch list items within 5 working days after the completion date for opening the roadway to traffic. Contract Specifics Completion Date: October 31, 2026 Plus 5 Working Days Questions not accepted as of September 09, 2025 04:30 PM Questions directed to: IDOT Contracts Office Harry R. Hanley Building Room 326 2300 South Dirksen Parkway Springfield, IL 62764 (217) 782-7806 Fax: (217) 785-1141 TDD: (217) 524-4875 DOT.DE-Contracts@illinois.gov Unless otherwise indicated, a proposal guaranty is required by bid bonds, cashiers check or properly certified check for not less than 5 (five) percent of the bid amount. If the proposal is accepted and the bidder is declared not responsive, it is hereby agreed that the amount of the proposal guaranty will become the property of the State of Illinois and shall be considered as payment of damages due to the delay and other causes suffered by the State because of the failure to adhere to the procedures required. Otherwise, the bid bond will become void or the proposal guaranty check will be returned to the bidder. Contractors who desire to become prequalified or to renew their prequalification for this letting must file with the Department of Transportation, Bureau of Construction, Room 322, 2300 South Dirksen Parkway, Springfield, Illinois 62764, a Contractor's Statement of Experience and Financial Condition no later than 4:30 PM prevailing local time, August 29, 2025. A contractor will not be prequalified for this letting unless the statement is received before the time and day established. The Department reserves the right to reject any and all bids, to waive minor or immaterial irregularities, informalities or technicalities, to advertise for new bids, or to request confirmation or clarification from any bidder regarding a bid. ILDOT - 020 - Overlay and Shoulder Reconstruction Includes (HMA)
Bid Results
Roads / Highways
$7,332,294.00
Public - State/Provincial
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 19, 2025
October 20, 2025
96th Ave & LaGrange Rd, Frankfort, IL
Related To This Project
Frankfort, IL
Bid Date: Sep 04 2025
Frankfort, IL
Bid Date: Aug 20 2025
Frankfort, IL
Bid Date: Nov 05 2025
Frankfort, IL
Bid Date: Aug 18 2025
Frankfort, IL
Bid Date: Aug 04 2025
Frankfort, IL
Bid Date: Aug 04 2025
Frankfort, IL
Bid Date: Aug 18 2025
Frankfort, IL
Bid Date: Jul 02 2025
Frankfort, IL
--
Frankfort, IL
Bid Date: May 08 2025
Frankfort, IL
Bid Date: May 08 2025
Frankfort, IL
--
Frankfort, IL
Bid Date: Mar 31 2025
Frankfort, IL
Bid Date: Apr 03 2025
Frankfort, IL
Bid Date: Feb 27 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
