BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 3, 2025 at 7:00 PM

Updated November 4, 2025

Renovation of a residential development in New Orleans, Louisiana. Completed plans call for the renovation of a residential development.

As of September 17, 2025, this project has not yet been awarded. The project is expected to be awarded on September 24, 2025. All responses must be submitted in accordance with the bid documents. All questions concerning interpretation, changes or modifications shall be referred to the Contracts Division via email: contracts@mccno.com. Plans, Specifications, or Bid Documents shall submit a written request to the Owner in time to be received by the Owner by Wednesday, August 27, 2025 at 10:00am I. Scope The Purpose of this policy is to ensure that maintenance and renovation to MCCNO are done in such a way to: Reduce waste and achieve higher diversion rates; Set criteria for products and furniture purchase for the building; Maintain air quality during construction projects.This policy applies to any ongoing facility maintenance activities and any facility renovations that occur in MCCNO. This policy includes guidelines for both staff and contractors to use in purchasing materials related to these activities, disposing of waste generated from these activities, and managing indoor air quality during these activities. The following materials are covered under this policy: Base building elements permanently or semi- permanently attached to the building (excluding mechanical, electrical, and plumbing components and specialty items such as elevators). Fixtures and equipment are not considered base building elements; Furniture and furnishings as well as necessary components and parts. For the purposes of this policy, routine maintenance includes but is not limited to painting, carpet replacement, and ceiling tile replacement. Renovations include fit-outs affecting more than one room, or large rooms such as the lobby or board room, and involve multiple elements, such as moving walls and electrical work, or replacing multiple different architectural finishes. If there is a question about whether a particular project or material is included in this policy, please contact the Sustainability Director, Linda Baynham,

Award

Residential Subdivision

$400,000.00

Public - City

Renovation

4

3

2

4

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
239
Active Projects
121
Bidding Soon
865
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 8, 2025

October 8, 2025

Project location map

To Be Determined, New Orleans, LA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.