BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 20, 2026 at 8:00 PM

Updated March 21, 2026

Site work and new construction of a mixed-use development in Toronto, Ontario. Conceptual plans call for the construction of a clubhouse / community center; for site work for a clubhouse / community center; and swimming pool.

Request for Supplier Qualifications for Ramsden Park Community Recreation Centre Design Competition Stage 1 RSFQ Architect. The new building will be accessible and net zero emissions. just steps away from the Rosedale Subway Station. The facility will front Ramsden park to the north and Budd Sugarman Park to the east and is proposed to include a 25-metre lane pool, a leisure pool, a gymnasium with a running track, and multi-se activity spaces. TIMELINE: Request for Supplier Qualifications for an architect has been closed. The following 5 design teams have short-listed: -CxA Architectes Paysagistes with gh3 (Montreal and Toronto); -Daoust Lestage (Montreal); -MJMA alongside Hapa Collaborative (Toronto and Vancouver); -Nippaysage with Saucier + Perrotte (Montreal); -PMA with Henning Larsen (Toronto and Copenhagen). For Stage II, these teams will develop and present conceptual designs for consideration and community consultation, expected summer 2026. Detailed designs would proceed through 2027. Construction start is currently targeted spring 2028. *Construction cost has yet to be finalized.

Conceptual

Clubhouse / Community Centers

$20,000,000.00

Public - City

New Construction, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
845
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 5, 2028

Project location map

Yonge Street, Toronto, ON

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.