BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 10, 2025 at 8:00 PM

Updated September 11, 2025

Site work for a bridge / tunnel in Richland, Georgia. Completed plans call for site work for a bridge / tunnel.

MOORES STORE ROAD at BUSSEY CREEK CROSSING - The project consists of removing and disposing of existing culvert, dewatering, and diverting existing stream, and constructing a new reinforced class AA concrete double 7'x7'x45' Box Culvert. The project scope is shown on the plans/cross-sections/maps as prepared by Construction Materials Services, Inc. for each project as listed above. Each bid shall be accompanied by a Bid Bond in an amount of not less than five percent (5%) of the total bid amount. The Bid Bond may be in the form of a surety issued bond or cashier's check made payable to Stewart County. The Bid Bond shall be forfeited to Stewart County as liquidated damages if the bidder fails to execute the Contract and provide Performance and Payment Bonds within fifteen (15) days after being notified that he has been awarded the Contract. Surety and insurance companies must have an AM Best rating of A-6 or greater, be listed in the Federal Registry of Companies holding Certificates of Authority and Acceptable Sureties on Federal Bonds, be licensed by the Georgia Insurance Department and the Georgia Secretary of State to do business in the State of Georgia. Each bid must be submitted in a SEALED ENVELOPE, addressed to the OWNER. Each sealed envelope, containing a bid, must be plainly marked on the outside Stewart County Moores Store Road Culvert Replacement GTIB Project. The OWNER of the project is Stewart County. The ENGINEER for the project is Andrew Johnson, PE of Construction Materials Services, Inc. If the bid is forwarded by mail, the sealed envelope containing the Bid must be enclosed in a separate mailing envelope to the attention of the OWNER at the address given above. Bids may not be withdrawn for sixty (60) days after the time and date set for closing, except as allowed by O.C.G.A. Stewart County reserves the right to reject any and all proposals and to waive any technicalities.

Post-Bid

Bridges / Tunnels

$400,000.00

Public - County

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
104
Active Projects
56
Bidding Soon
679
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 9, 2025

October 9, 2025

Project location map

Moores Store Rd, Richland, GA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.