BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 27, 2025 at 7:00 PM

Updated November 28, 2025

Site work for a water / sewer project in Newmarket, Ontario. Completed plans call for site work for a water / sewer project.

The Regional Municipality of York (York Region) is required to expand and improve the existing York Durham Sewage System (YDSS), in response to the Provincial Bill 23 under the Supporting Growth and Housing in York and Durham Regions Act (Ontario 2022), by implementing the York Region Sewage Works Project, to be delivered in three phases from 2023 to 2041. The Project Report can be accessed via york.ca/SewageWorks. Part of that system expansion includes the Primary Trunk Twinning project which involves the twinning of the existing Primary Trunk, an approximately 5.26 km long single trunk sanitary sewer that, originates at the end of York Region's Southeast Collector (SEC) system and conveys both York and Durham wastewater flows to the Duffin Creek Water Pollution Control Plant (WPCP) (the "Project"). The Project will be a significant component of the YDSS and is paramount for, providing capacity and redundancy to the YDSS, reducing the risk of major system failure, increasing resilience, conveyance, pumping capacity, and providing system operational flexibility. The Project will be delivered using a progressive construction management delivery model with early contractor involvement (ECI). Under this model, a construction manager at risk (the CMAR Contractor) will be retained by the Region early in the design phase of the Project to provide construction management services throughout the preconstruction and design period. For the Primary Trunk Twinning project, the Construction Manager will be a firm that will self-perform the construction of the tunnel and manages sub-contractors who may be needed to support ancillary works. The CMAR Contractor will provide constructability input during the preconstruction and design phase, including but not limited to, schedule planning, phasing strategies, constructability reviews, alternative construction approaches, risk management, cost estimating, and plan and design reviews. The estimated capital cost for the construction of the Primary Trunk Twin is approximately $406,000,000.00 (-20% to + 30%) based on recent market analysis, subject to the Region obtaining the necessary funding and approvals from Regional Council. Preconstruction work is expected to commence the first quarter of 2026 and construction work is to commence during the first quarter of 2028. Project Timelines: Announce Pre-Qualified Contractors: September 2025 Anticipated Release of RFP: Fall 2025 Anticipated Award of RFP: Winter 2025/2026 Anticipated Start of Pre-Construction Services: Q1 2026 Anticipated Start of Construction: Q1 2028 Anticipated Completion of Construction: Q1 2031 Documents can be obtained at: https://york.bidsandtenders.ca

Post-Bid

Water / Sewer

$406,000,000.00

Public - County

Site Work

16

3

7

9

Subscribe For Documents

34 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
570
Active Projects
333
Bidding Soon
4,370
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 26, 2025

January 3, 2028

Project location map

Multiple Locations, Newmarket, ON

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.