BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 18, 2026 at 8:00 PM

Updated March 19, 2026

Demolition, site work, new construction and addition to a mixed-use development in Norton, Vermont. Conceptual plans call for site work for a bridge / tunnel; communication facility; parking garage; for the addition of a 18,221-square-foot museum; for the demolition of a museum; for the construction of a museum; and museum.

Multiple construction projects are planned at Land Ports of Entry (LPOEs) in Maine and Vermont. These projects are part of the Bipartisan Infrastructure Law (BIL) initiative and include major modernization efforts at several locations. In Maine, the projects involve the Coburn Gore, Fort Fairfield, Limestone, and Jackman LPOEs. In Vermont, the projects include Highgate Springs, Alburg Springs, Norton, and Beebe Plain LPOEs. The scope of work encompasses various construction activities aimed at upgrading and improving the infrastructure and operational capabilities of these border facilities. Location: Coburn Gore LPOE, ME - 1 Main Street, Coburn Gore, ME 04936 Fort Fairfield LPOE, ME - 27 Customs Street, Fort Fairfield, ME 04742 Limestone LPOE, ME - 2 Bridge Street, Limestone, ME 04750 Jackman LPOE, ME - 1 Forest Street, Jackman, ME 04945 Highgate Springs LPOE, VT - 1 Interstate Access Road, Highgate Springs, VT 05460 Alburg Springs LPOE, VT - 1 Border Street, Alburg, VT 05440 Norton LPOE, VT - 1 Route 114, Norton, VT 05907 Beebe Plain LPOE, VT - 1 Beebe Road, Derby Line, VT 05830 The estimated construction price range for Norton, VT is between $55M and $65M. The estimated contract duration is approximately 24 months from notice to proceed. As of March 18, 2026, an issuance of short-listed firms has not been released. A design build firm selection has not been disclosed. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Conceptual

Museum

$65,000,000.00

Public - Federal

Addition, Demolition, New Construction, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 7, 2027

Project location map

Multiple Locations, Norton, VT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.