Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 19, 2025 at 8:00 PM
Updated August 20, 2025
Demolition, site work, new construction and addition to a mixed-use development in Norton, Vermont. Conceptual plans call for site work for a bridge / tunnel; communication facility; parking garage; for the addition of a museum; for the demolition of a museum; for the construction of a museum; and museum.
Multiple construction projects are planned at Land Ports of Entry (LPOEs) in Maine and Vermont. These projects are part of the Bipartisan Infrastructure Law (BIL) initiative and include major modernization efforts at several locations. In Maine, the projects involve the Coburn Gore, Fort Fairfield, Limestone, and Jackman LPOEs. In Vermont, the projects include Highgate Springs, Alburg Springs, Norton, and Beebe Plain LPOEs. The scope of work encompasses various construction activities aimed at upgrading and improving the infrastructure and operational capabilities of these border facilities. Location: Coburn Gore LPOE, ME - 1 Main Street, Coburn Gore, ME 04936 Fort Fairfield LPOE, ME - 27 Customs Street, Fort Fairfield, ME 04742 Limestone LPOE, ME - 2 Bridge Street, Limestone, ME 04750 Jackman LPOE, ME - 1 Forest Street, Jackman, ME 04945 Highgate Springs LPOE, VT - 1 Interstate Access Road, Highgate Springs, VT 05460 Alburg Springs LPOE, VT - 1 Border Street, Alburg, VT 05440 Norton LPOE, VT - 1 Route 114, Norton, VT 05907 Beebe Plain LPOE, VT - 1 Beebe Road, Derby Line, VT 05830 The estimated construction price range for Norton, VT is between $55M and $65M. The estimated contract duration is approximately 24 months from notice to proceed. The Method of Contractor Selection has not been determined at this Time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Conceptual
Museum
$65,000,000.00
Public - Federal
Addition, Demolition, New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 5, 2026
Multiple Locations, Norton, VT
Related To This Project
Norton, VT
Bid Date: Nov 14 2025
Norton, VT
Bid Date: Jul 11 2025
Norton, VT
--
Norton, VT
Bid Date: Feb 09 2024
Hancock, VT
--
Weathersfield, VT
Bid Date: Aug 26 2025
Saint Albans, VT
Bid Date: Aug 27 2025
Burlington, VT
Bid Date: Dec 10 2025
Burlington, VT
Bid Date: Aug 27 2025
South Burlington, VT
Bid Date: Sep 03 2025
Montpelier, VT
Bid Date: Aug 27 2025
Burlington, VT
Bid Date: Sep 10 2025
Chelsea, VT
Bid Date: Aug 18 2025
Chelsea, VT
Bid Date: Aug 18 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
