Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 2, 2025 at 8:00 PM
Updated October 3, 2025
Site work for a water / sewer project in Barnhart, Missouri. Completed plans call for site work for a water / sewer project.
Prospective bidders are highly recommended to complete a site visit to review limiting site conditions/ constraints and site access. Question Deadline 09/12/2025 Latest Time to Submit Questions shall be directed to: e-mail: zyork@hurst-rosche.com lheibel@hurst-rosche.com Request for Interpretation: All questions must be submitted on the Request for Interpretation Pre-Bid Question and Comment Form included at the end of this section, and questions not submitted in accordance with this form and specified time frame will not be accepted. Work includes rehabilitation of existing 300,000 gallon welded steel single pedestal elevated water storage tank including full containment, low pressure water cleaning of exterior to remove mold and mildew, sandblast cleaning and painting of interior and exterior including slip-resistant additive for smoother ladder rungs for existing interior dry ladder(s) to comply with OSHA and AWWA standards, apply exterior logo / lettering, removal and proper disposal of waste, cleaning debris from behind existing oveflow pipe outlet screen and install duck bill check valve, removal and replacement of existing interior wet bowl access ladder with new OSHA compliant interior wet bowl access ladder including safety climb system, removal and replacement of existing roof wet access hatch, weld new steel patch plates over existing screen cutouts on the access neck of the existing roof dry access hatch, replacement of existing interior light bulbs in the interior dry access tube with new LED light bulbs, relocation of existing electrical conduit(s) attached to existing interior dry ladder(s) siderails and attach to new interior dry standoff supports to comply with OSHA and AWWA standards and making the existing interior dry ladder(s) OSHA compliant, removal and replacement of existing grout / seal caulk at lower tank flange and concrete foundation/ringwall (full base cone circumference), tank disinfection, all appurtenances, and minor details necessary to make the completed improvements fully operational with the project specifications. Bidders will be required to provide Bid security of a sum no less than 5 percent of the Bid Sum. The bid security shall be either certified check, cashier's check, bank money order or bid bond issued by surety licensed to conduct business in the State of Missouri. Hereinafter this bid security shall be referred to as the bid bond. Submit one copy of your Bid on the Bid Form provided. Bidders may supplement this form as appropriate. Your Bid submittal will be required to be under a condition of irrevocability for a period of Ninety (90) days after submission. The Owner reserves the right to accept or reject any or all Bids or any part thereof, to waive any informality in bidding, and to accept bids deemed most favorable to the Owner. The Owner requires the Project to be completed in 150 calendar days from the Construction Start Date as stipulated in the Notice to Proceed. Work to be completed in Fall 2025 with work being completed after Labor Day (September 1, 2025) or in Spring 2026 by Memorial Day (May 25, 2026). Notice to Proceed will be issued accordingly based on work being completed in Fall 2025 or Spring 2026. Doc Notes: Bidding Documents, Drawings and Specifications will be available for viewing on the internet at online. The documents are being provided for reference purposes only. Bidders must obtain a signed and sealed hardcopy set of the bidding documents, including bid form from the offices of Hurst-Rosche, Inc., 3675 W. Outer Road, Suite 205, Arnold, Missouri 63010 to submit a bid for this project.
Award
Water / Sewer
$492,700.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
12
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 19, 2025
October 20, 2025
1301 Olive St, Barnhart, MO
Related To This Project
Barnhart, MO
Bid Date: Aug 08 2025
Barnhart, MO
--
Barnhart, MO
Bid Date: Aug 06 2024
Barnhart, MO
Bid Date: Jul 16 2024
Barnhart, MO
Bid Date: Jun 11 2024
Barnhart, MO
Bid Date: Jun 04 2024
Barnhart, MO
Bid Date: Mar 15 2024
Barnhart, MO
Bid Date: Jan 25 2024
Barnhart, MO
Bid Date: Sep 07 2023
Barnhart, MO
Bid Date: Nov 14 2022
Farmington, MO
Bid Date: Sep 18 2025
Neosho, MO
Bid Date: Sep 11 2025
Rolla, MO
Bid Date: Aug 28 2025
Portage des Sioux, MO
Bid Date: Sep 05 2025
Lees Summit, MO
Bid Date: Sep 02 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
