Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 3, 2025 at 8:00 PM
Updated October 4, 2025
Renovation of a municipal facility in Oklahoma City, Oklahoma. Completed plans call for the renovation of a 160,000-square-foot municipal facility.
Rebid of Existing Bid Packages: BP #16 - Irrigation / Landscaping / Sod BP #32 - Exterior Metal Panels / Louvers BP #44 - Interior Metal Surfaces BP #50A - Division 10 - Toilet Partitions ** BP #50B - Division 10 - Toilet Accessories ** BP #50C - Division 10 - Fire Extinguishers & Cabinets ** New Bid Packages: BP #63 - Grounds Betterment Concrete Structures ** BP #64 - Grounds Betterment Structural Steel Fabrication BP #65 - Grounds Betterment Structural Steel Erection BP #66 - Grounds Betterment Masonry / Limestone / Waterproofing * BP #67A - Grounds Betterment Furnishings ** BP #67B - Terrace Betterment Furnishings ** BP #68 - Parking Lot Demo BP #69 - Parking Lot Misc Concrete BP #70 - Parking Lot Lighting & Electrical BP #71 - Parking Lot Paving & Overlay BP #72 - Parking Lot Signage Bids received more than ninety-six (96) hours, excluding Saturdays, Sundays, and holidays, before the time set for opening bids, as well as bids received after the time set for opening bids, will not be considered and will be returned unopened. For bids in excess of $50,000.00, a Cashier's Check, certified check, or surety bond in the amount of five percent (5%) of the bid shall accompany the sealed proposal of each bidder. No Bids may be withdrawn after the scheduled closing time for receipt of Bids for a period of at least sixty (60) days. The Owner reserves the right to reject any or all bids . Summary Project Description: The renovation of the Jim Thorpe Office Building. The building was completed in 1938 and has not had major renovations since the 1960's. It is approximately 160,000 square feet.. B. Contract Scope: renovation. C. Contract Terms: Cost plus a fee, with a guaranteed maximum price (GMP). D. The unoccupied premises at the project site are available for examination by bidders by appointment only. Bidders shall contact the Contractor for permission to examine site. A. It is the intent of the following to describe the scope of work included in each Bid Package. The bid shall include all the requirements in the plans and specification sections listed in the published bid documents, unless specifically noted below. B. If the scope of work includes Labor, then the successful bidders must provide General Liability, Auto and Workers Compensation with Certificate listing Additional Insured and Waiver of Subrogation in favor of the Owner, Architect, Construction Manager and any others requested at time of contract issuance. C. If the scope of work is to only supply Material, then the successful bidders must include all labor, materials, services and incidentals required for complete fabrication, manufacture and delivery to the project site the materials included in the designated specification sections and drawings. D. If any Bidder is unclear as to the Scope of Work required, contact the Architect/Construction Manager prior to bidding. Prior approval is required for all bid packages. DO NOT MODIFY, ADD, OR DELETE FROM SCOPE OF WORK or you risk the Owner setting your bid aside. E. The Construction Manager may bid on any or any combination of bid packages, but will declare such information at the Pre-Bid conference. A. It is the intent of the following to describe the scope of work included in each Bid Package. The bid shall include all the requirements in the plans and specification sections listed in the published bid documents, unless specifically noted below. B. If the scope of work includes Labor, then the successful bidders must provide General Liability, Auto and Workers Compensation with Certificate listing Additional Insured and Waiver of Subrogation in favor of the Owner, Architect, Construction Manager and any others requested at time of contract issuance. C. If the scope of work is to only supply Material, then the successful bidders must include all labor, materials, services and incidentals required for complete fabrication, manufacture and delivery to the project site the materials included in the designated specification sections and drawings. D. If any Bidder is unclear as to the Scope of Work required, contact the Architect/Construction Manager prior to bidding. Prior approval is required for all bid packages. DO NOT MODIFY, ADD, OR DELETE FROM SCOPE OF WORK or you risk the Owner setting your bid aside. E. The Construction Manager may bid on any or any combination of bid packages, but will declare such information at the Pre-Bid conference. Construction Operations: Limited to areas noted on Drawings. 1. Locate and conduct construction activities in ways that will limit disturbance to site. a. The Design Builder and the Owner's Project Team will establish the site construction limits and phasing during the Scope Development phase and further define limits during the design phases. B. Provide access to and from site as required by law and by Owner: 1. Emergency Building Exits During Construction: Keep all exits required by code open during construction period; provide temporary exit signs if exit routes are temporarily altered. 2. Do not obstruct roadways, sidewalks, or other public ways without permit. C. Utility Outages and Shutdown: 1. Do not disrupt or shut down life safety systems, including but not limited to fire sprinklers and fire alarm system, without 7 days notice to Owner and authorities having jurisdiction. 2. Prevent accidental disruption of utility services to other facilities. Bid Result : BP #16 - Irrigation / Landscaping / Sod - Pitzer's - $187,564.00 BP #32 - Exterior Metal Panels / Louvers - QUAD - $118,723.00 BP #44 - Interior Metal Surfaces - Art Form - $88,445.00 BP #50A - Division 10 - Toilet Partitions - Oklahoma Specialty Supply - $87,800.00 BP #50B - Division 10 - Toilet Accessories - Oklahoma Specialty Supply - $84,700.00 BP #50C - Division 10 - Fire Extinguishers & Cabinets - Oklahoma Specialty Supply - $11,800.00 BP #63 - Grounds Betterment Concrete Structures - QUAD - $144,540.00 BP #64 - Grounds Betterment Structural Steel Fabrication - Shawnee Fabricators - $39,500.00 BP #65 - Grounds Betterment Structural Steel Erection - Allied Steel - $18,800.00 BP #66 - Grounds Betterment Masonry / Limestone / Waterproofing - Mid-Continental Restoration - $620,218.00 BP #67A - Grounds Betterment Furnishings - QUAD - $63,236.00 BP #67B - Terrace Betterment Furnishings - QUAD - $160,385.00 BP #68 - Parking Lot Demo BP #69 - Parking Lot Misc Concrete - Midwest Wrecking - $27,840.00 BP 69 - Parking Lot Misc Concrete - QUAD - $28,667.0 BP #70 - Parking Lot Lighting & Electrical - KB Electric - $119,100.00 BP #71 - Parking Lot Paving & Overlay - Connelly Paving - $497,000.0 0 BP #72 - Parking Lot Signage - Vital Signs of Oklahoma - $49,870.00
Bid Results
Municipal
$2,348,188.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 3, 2025
November 3, 2025
2101 N Lincoln Blvd, Oklahoma City, OK
Related To This Project
Oklahoma City, OK
Bid Date: Sep 18 2025
Oklahoma City, OK
Bid Date: Nov 05 2025
Oklahoma City, OK
Bid Date: Sep 17 2025
Oklahoma City, OK
Bid Date: Oct 09 2025
Oklahoma City, OK
Bid Date: Sep 12 2025
Oklahoma City, OK
Bid Date: Oct 29 2025
Oklahoma City, OK
Bid Date: Sep 17 2025
Oklahoma City, OK
Bid Date: Sep 17 2025
Oklahoma City, OK
Bid Date: Sep 03 2025
Oklahoma City, OK
Bid Date: Aug 28 2025
Oklahoma City, OK
--
Oklahoma City, OK
Bid Date: Sep 03 2025
Oklahoma City, OK
Bid Date: Sep 03 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.