BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 30, 2025 at 8:00 PM

Updated October 31, 2025

Site work and paving for a road / highway in Jacksonville, Florida. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Counties : Duval Road Name: Mill and Resurface Limits: 72001000 Project(s): 45564037202(*) Federal Aid No: N/A Total Roadway Length: 16.700 Miles Contract Days: 60 Total Bridge Length: 0.000 Miles Total Proposal Length: 16.700 Miles Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 15 Day(Acq.time) Description: The Work Under This Contract Consists of Supplying All Equipment, Materials, Labor, and Incidentals to Mill and Resurface Roadways, Replacement of All Thermoplastic Striping, Reflective Pavement Markers (Rpm's), Maintenance of Traffic (Mot), and Mobilization at Various Locations in Duval County as Shown in the Appendices. All Work Will Be Described in Detail on One or More Individual Work Documents Issued During the Life of This Contract. The Individual Work Orders Will Be Developed Using a Per Lane Mile Cost Multiplied by the Lane Miles to Be Completed for That Specific Work Order. The Cost Per Lane Mile Will Be Calculated by Taking the Contractor's Lump Sum Price and Dividing It by the Total Lane Miles Identified in the Appendices - Priorities 1, 2 and 3 [27.819 Lane Miles]. Contractor's Lump Sum Price, Divided by 27.819 Lane Miles Will Equal the Cost Per Lane Mile to Be Utilized in The Work Order by the Department. This is a Lump Sum Contract With Only One Pay Item Listed in the Contract. Experience in Asphalt Paving (Form 850-070-01) Must Be Completed and Submitted With the Bid. Budget Estimate - $4,095,000.00. Question Deadline 09/10/2025 at 5:00 PM ET, Questions posted to this site will be responded to by the Department. For questions posted after this time, an answer cannot be assured. For all questions posted before the deadline, FDOT will provide and post responses on online. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00 A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - 008 - Mill and Resurface Roadways, Replacement of All Thermoplastic Striping

Award

Roads / Highways

$4,263,500.00

Public - State/Provincial

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
146
Active Projects
66
Bidding Soon
992
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 17, 2025

September 29, 2025

Project location map

Multiple Locations, Jacksonville, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.