BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 26, 2025 at 8:00 PM

Updated September 27, 2025

Site work for a water / sewer project in Austin, Texas. Completed plans call for site work for a water / sewer project.

Approximately 4,000 feet of 36-inch water transmission main along E Howard Ln and Fish Ln, 3,900 feet of 24-inch water main along Dessau Rd and Crystal Bend Dr, and 1,135 feet of 24-inch wastewater interceptor along Crystal Bend Dr. African American - 2.99% Hispanic American - 4.13% Native/Asian American - 0.34% WBE - 2.18%. SP-2023-0367D 1020 E HOWARD LANE - 1420 1/2 E HOWARD LANE REVIEWED BY: 1600 FISH LANE - 1625 1/2 FISH LANE 13525 DESSAU ROAD -13649 DESSAU ROAD 1600 CRYSTAL BEND DRIVE -2303 CRYSTAL BEND DRIVE The Work shall include furnishing all tools, labor, materials, equipment, and miscellaneous items necessary for the complete construction of new water and wastewater lines ranging from 8-inch to 36- inch diameter mains. Water line construction includes approximately 280 linear feet of open cut 8-inch, 3,680 linear feet of open cut 24-inch, 173 linear feet of jack and bore for 24-inch water line, 3,141 linear feet of open cut 36-inch, and 781 linear feet of jack and bore for 36-inch water lines and associated appurtenances. Wastewater construction includes approximately 662 linear feet of open cut 24-inch gravity wastewater line, trench safety and associated manholes in depths ranging up to 25 vertical feet, and 514 linear feet of jack and bore for 24-inch wastewater carrier pipes. The project also includes wastewater bypass pumping, abandonment of existing manholes, wet connections to existing small and large diameter water lines, salvaging fire hydrant assemblies, erosion controls, seeding, pavement restoration, traffic control and other incidentals required to complete the work. All addenda and answers to Bidders' questions will also be posted in the attachments section for each solicitation on the City's Vendor Connection website. Question Deadline 09/16/2025 Prospective Bidders desiring further information or interpretation of Project Manual or Drawings must make a written request for such information to OWNER addressed to the Authorized Contact Person listed in Section 00020 no later than seven (7) Working Days before Bid opening.

Bid Results

Water / Sewer

$10,025,500.00

Public - City

Site Work

90

14

16

3

Subscribe For Documents

37 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
310
Active Projects
58
Bidding Soon
2,852
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.