BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 22, 2025 at 8:00 PM

Updated September 23, 2025

Site work and paving for a civil project in Atlanta, Georgia. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

The Mountain Creek Road Maintenance Project involves rehabilitating approximately 90 LF of 72" corrugated metal pipe using centrifugally cast concrete pipe (CCCP), replacing the upstream headwall, installing upstream stream bed protection, and replacing part of the driveway at 5775 Mountain Creek Road. Work also includes site grading, erosion control, and protection of an existing 10" Fulton County sewer line crossing the headwall. phase 1: 1. construction of upstream retaining wall / headwall 2. application of cccp lining to ex. 72" cmp 3. application of stream bed protection in the upstream section 4. site clearing and grading complete associated within lod in current phase 5. erosion control within lod in current phase phase 2: 1. construction of downstream retaining wall / headwall 2. application of cccp lining to ex. 60" cmp 3. application of stream bed protection in the upstream section 4. site clearing and grading complete associated within lod in current phase 5. erosion control within lod in current phase Location- 5775 Mountain Creek Rd NE Atlanta, GA 30328 This project involves the installation of Centrifugally Cast Concrete Pipe (CCCP) to approximately 90 linear feet (LF) of 72" Corrugated Metal Pipe (CMP), removal and installation of the upstream headwall, installation of stream bed protection in the upstream section, replacement of a portion of the existing driveway at 5775 Mountain Creek Road, site grading, and erosion control.An existing 10" Fulton County sewer line crosses the upstream headwall and needs to be protected. The contractor is required to submit a traffic control plan for the City's review and approval prior to lane closures. During construction one lane of the roadway must be open at all times. The contractor is responsible for linking to the permitted City Project as well as applying for a Rightof-Way Utility Permit. Detailed daily reports, including photographs, will be required as part of this project. Questions Due Date: Sep 9th 2025, 5:00 PM EDT - All questions or requests for clarification must be sent via Online. Questions received after this date and time may not be answered. There is a pre-bid meeting associated with this solicitation. All communications regarding this solicitation must be with the assigned Procurement Agent, Reginald Starling, purchasing@sandyspringsga.go

Bid Results

Water / Sewer

$354,970.00

Public - City

Paving, Site Work

39

8

2

3

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
281
Active Projects
149
Bidding Soon
1,829
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 19, 2025

October 20, 2025

Project location map

5775 Mountain Creek Rd NE, Atlanta, GA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.