BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 23, 2025 at 8:00 PM

Updated September 9, 2025

Site work and paving for a mixed-use development in Euclid, Ohio. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

The City of Euclid's Division of Community Development, through the Department of Planning and Development, is requesting proposals from qualifying and appropriate cement contractors for replacement of 51 existing pedestrian crosswalk aprons with new Americans with Disabilities Act (ADA)-accessible pedestrian crosswalk aprons within three target areas in Euclid. Additionally, the City of Euclid is partnering with the Greater Cleveland Regional Transit Authority (GCRTA) to make accessibility improvements to three existing transit stops along Lake Shore Boulevard, and to support GCRTA's efforts to provide additional bus shelters with pedestrian accessibility improvements that conform to the ADA. A detailed Scope of Work for each project location are detailed in "Section 3: Scope of Work and Specifications" of this Request for Proposals. Include in this section will include specifications provided by GCRTA for the bus stop pads. Proposals will be accepted by the Department of Planning and Development no later than deadline. They may be submitted through one of the two following means: 1. In-Person Submission: Euclid City Hall, 585 E. 222 Street - Euclid, OH 44123, or 2. Via Email at planning@cityofeuclid.com The project locations for this program will be at the following target areas: Target Area 1: Intersection of Halle Avenue and Walworth Avenue; E. 255 Street and Forestview Avenue; E. 253 Street and Zeman Avenue, Farringdon Avenue, Drakefield Avenue, and Briardale Avenue Target Area 2: E. 254 Street and Briardale Avenue, Marsdon Avenue, and Richards Avenue; Helen Avenue and E. 256 Street and E. 258 Street Target Area 3: Cameron Avenue and E. 270 Street, E. 271 Street, and E. 272 Street; Forestview Avenue and E. 270 Street, E. 271 Street, and E. 272 Street; Fullerwood Avenue and E. 270 Street, E. 271 Street, and E. 272 Street; Parkwood Avenue and E. 271 Street and E. 272 Street; E. 272 Street and Sycamore Avenue and Shirley Avenue. Target Area 4 (Bus Stops): Lake Shore Boulevard and E. 246 Street, E. 260 Street (Eastbound), and E. 264 Street (Westbound) Contents of Section: 1. Lists of Pedestrian Crosswalk Ramp and Sidewalk Locations, and Bus Stop Locations 2. Crosswalk Replacement Target Areas 1, 2, and 3 Site Maps, with Corresponding Crosswalk Location Maps 3. Bus Stop Improvements Target Area 4 Site Map, with Corresponding Bus Stop Location Map Procedures for Pedestrian Crosswalk Replacement: 1. Remove existing concrete pedestrian crosswalk ramps at indicated street corners. All street corners will be marked with orange paint. Please see lists and maps in Section 2 for location details. 2. Properly dispose of debris from removed crosswalk ramps. 3. Form, prep, and pour concrete sidewalk curb ramps with detectable warning surface added. Replacement ramps must conform to specifications of both the Ohio Department of Transportation (ODOT) and the Americans with Disabilities Act (ADA) for acceptable slope and pitch. Concrete should be a minimum thickness of 4". 4. Backfill as necessary. 5. Top dress, seed and straw as necessary. Procedures for Pedestrian Sidewalk Installation and Replacement: All sidewalk blocks must be of 4" thickness per applicable sidewalk codes.

Post-Bid

Sidewalks / Parking Lot

$63,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
223
Active Projects
89
Bidding Soon
1,800
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 8, 2025

October 8, 2025

Project location map

Multiple Locations, Euclid, OH

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.