BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 16, 2025 at 8:00 PM

Updated October 17, 2025

Renovation of a detention facility in Jackson, Michigan. Completed plans call for the renovation of a detention facility.

Cooper Street Correctional Facility - Sally Port Shack. 5% Bid Security Required. Question Deadline 09/11/2025 at 2:00 PM ET Please do not submit online questions via online. ALL questions should be emailed to Joe Sovis at jsovis@matrixceinc.com. Site walk through Notes: (Dept. of Corrections ONLY) All contractor/vendor representatives attending a Pre-Bid Walk Through Meeting must submit a Vendor/Contractor LEIN Request five business days prior to the meeting date, (See the attached Vendor/Contractor LEIN Request form). Send the LEIN Request form, filled out and signed, by email to Daniel T. Smith & Sharon Frost at email addresses: SmithD76@michigan.gov & FrostS1@michigan.gov .The email "Subject" must include "Cooper Street Correctional Facility - Sally Port Shack, September 4, 2025, at 9:00 am". NOTE: An individual is only permitted to represent one bidder at a mandatory walk-through. All bid responses require proof of State Project Registration from the Department of Labor and Economic Opportunity. Bid responses and bid attachments MUST be uploaded to SIGMA VSS. Furnish all equipment, materials, labor, and services necessary to complete all building demolition required in connection with the existing building, in order to permit the installation of new Work. The goal of the Owner is to generate the least amount of waste or debris possible. However, inevitable waste and debris that are generated shall be reused, salvaged, or recycled, and disposal in landfills shall be minimized to the extent economically feasible. The Contractor will be required to prepare waste management plan for the collection, handling, storage, transportation, and disposal of the waste generated at the construction site for the Owner's review and approval. The Contractor will be required to produce waste management progress reports. 1. Locations: Notations are made in various places on the Drawings to call attention to building demolition which is required; however, these Drawings are not intended to show every item to be removed. The Contractor and the Subcontractors for the various trades must remove the materials related to their respective trades as required to permit the construction of the new Work as shown New 8'x12' premanufactured Sally Port Shack on concrete pad. 1065_24B, 472/21302.RWG, 25000400

Award

Jails / Prisons

$142,074.00

Public - Federal

Renovation

6

16

2

5

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
388
Active Projects
228
Bidding Soon
2,729
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 17, 2025

November 17, 2025

Project location map

3100 Cooper St, Jackson, MI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.