Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 29, 2025 at 8:00 PM
Updated November 6, 2025
Site work for a water / sewer project in Taylor, Texas. Completed plans call for site work for a water / sewer project.
Reference Number 0000396490 The Trinity Well #1 is located on the campus of the Brazos River Authority's (BRA) East Williamson County Regional Water System (EWCRWS) water treatment plant (EWCWTP) and is expected to add up to 4 million gallons of water per day (MGD) to the EWCWTP. The modifications and improvements to blend this new groundwater source into the existing EWCWTP's finished water is the Phase 1B Trinity Well Infrastructure Project. The purpose of the Phase 1B project is to cool, disinfect, and blend The Trinity Well #1 water with the existing EWCWTP's finished water. Bid Intent Not Available The BRA shall have the right to accept or reject any or all Bids, or any part thereof, and to waive any technicalities in the interest of the BRA. 201 COUNTY ROAD 496 TAYLOR, TEXAS 76574 Question Deadline 10/03/2025 at 4:00 PM CT Yes Last date and time to ask questions or request additional information. Please submit your questions online The Trinity Well #1 is located on the campus of the Brazos River Authority's (BRA) East Williamson County Regional Water System (EWCRWS) water treatment plant (EWCWTP) and is expected to add up to 4 million gallons of water per day (MGD) to the EWCWTP. The modifications and improvements to blend this new groundwater source into the existing EWCWTP's finished water is the Phase 1B Trinity Well Infrastructure Project. The purpose of the Phase 1B project is to cool, disinfect, and blend The Trinity Well #1 water with the existing EWCWTP's finished water, which generally includes: Connection of Phase 1B improvements to the existing Trinity Well discharge header pipe, Motor actuated rate-of-flow control valves and flow meter, Cooling towers, Cooling tower supporting structure capable of expansion in the future, Cooling tower bypass piping, Chlorine contact chambers and pipeline from the cooling towers to the existing Clearwell, Miscellaneous yard piping and valves, Improvements to the existing chlorine and liquid ammonium sulfate (LAS) feed systems, Chemical injection vaults, static mixers, and associated yard piping, and Stormwater drainage and access road improvements.
Post-Bid
Water / Sewer
$400,000.00
Public - State/Provincial
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 23, 2025
November 17, 2025
201 Co Rd 496, Taylor, TX
Related To This Project
Taylor, TX
Bid Date: Sep 24 2025
Taylor, TX
Bid Date: Oct 07 2025
Taylor, TX
--
Taylor, TX
--
Taylor, TX
--
Taylor, TX
Bid Date: Nov 05 2025
Taylor, TX
--
Taylor, TX
Bid Date: Aug 19 2025
Taylor, TX
--
Taylor, TX
Bid Date: Aug 15 2025
Taylor, TX
--
Taylor, TX
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
