BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 29, 2025 at 8:00 PM

Updated November 6, 2025

Site work for a water / sewer project in Taylor, Texas. Completed plans call for site work for a water / sewer project.

Reference Number 0000396490 The Trinity Well #1 is located on the campus of the Brazos River Authority's (BRA) East Williamson County Regional Water System (EWCRWS) water treatment plant (EWCWTP) and is expected to add up to 4 million gallons of water per day (MGD) to the EWCWTP. The modifications and improvements to blend this new groundwater source into the existing EWCWTP's finished water is the Phase 1B Trinity Well Infrastructure Project. The purpose of the Phase 1B project is to cool, disinfect, and blend The Trinity Well #1 water with the existing EWCWTP's finished water. Bid Intent Not Available The BRA shall have the right to accept or reject any or all Bids, or any part thereof, and to waive any technicalities in the interest of the BRA. 201 COUNTY ROAD 496 TAYLOR, TEXAS 76574 Question Deadline 10/03/2025 at 4:00 PM CT Yes Last date and time to ask questions or request additional information. Please submit your questions online The Trinity Well #1 is located on the campus of the Brazos River Authority's (BRA) East Williamson County Regional Water System (EWCRWS) water treatment plant (EWCWTP) and is expected to add up to 4 million gallons of water per day (MGD) to the EWCWTP. The modifications and improvements to blend this new groundwater source into the existing EWCWTP's finished water is the Phase 1B Trinity Well Infrastructure Project. The purpose of the Phase 1B project is to cool, disinfect, and blend The Trinity Well #1 water with the existing EWCWTP's finished water, which generally includes: Connection of Phase 1B improvements to the existing Trinity Well discharge header pipe, Motor actuated rate-of-flow control valves and flow meter, Cooling towers, Cooling tower supporting structure capable of expansion in the future, Cooling tower bypass piping, Chlorine contact chambers and pipeline from the cooling towers to the existing Clearwell, Miscellaneous yard piping and valves, Improvements to the existing chlorine and liquid ammonium sulfate (LAS) feed systems, Chemical injection vaults, static mixers, and associated yard piping, and Stormwater drainage and access road improvements.

Post-Bid

Water / Sewer

$400,000.00

Public - State/Provincial

Site Work

230

36

4

10

Subscribe For Documents

55 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
281
Active Projects
142
Bidding Soon
2,784
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.