BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 11, 2025 at 7:00 PM

Updated November 13, 2025

Site work, paving and renovation of a mixed-use development in Taylor, Texas. Completed plans call for the renovation of a playground / park / athletic field; for site work for a playground / park / athletic field; sidewalk / parking lot; sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

**As of September 30, 2025, this project has not yet been awarded. A timeline for the award has not yet been established.** Replacement of the pavilion in Bull Branch Park, renovation of the bathrooms in Bull Branch Park and Murphy Park, and installation of around 600 LF of concrete sidewalk with associated grading, parking, and drainage improvements. The project work in Bull Branch Park includes the replacement of the existing pavilion and renovation of the adjacent bathroom building, as well as sidewalk replacement and ADA parking renovation. Includes site prep work, ADA improvements, haul off old materials, erosion control, and revegetation. The project work in Murphy Park includes renovation of existing bathroom building, renovation of asphalt pavement parking area, and concrete sidewalk installation to connect various park amenities. Included, but not limited to, site prep work, ADA improvements, haul-off of old materials, grading, erosion control, and revegetation. Question Deadline 09/18/2025 at 5:00 PM CT Please send questions to: Conor Stuart Municipal Engineer The project work in Bull Branch Park includes the replacement of the existing pavilion and renovation of the adjacent bathroom building, as well as sidewalk replacement and ADA parking renovation. Includes site prep work, ADA improvements, haul off old materials, erosion control, and revegetation. The project work in Murphy Park includes renovation of existing bathroom building, renovation of asphalt pavement parking area, and concrete sidewalk installation to connect various park amenities. Included, but not limited to, site prep work, ADA improvements, haul-off of old materials, grading, erosion control, and revegetation. The bid will be awarded to the Lowest responsible bidder meeting specifications. The City intends to award this contract to one (1) contractor. 737-230-7318 conor.stuart@hdrinc.com

Award

Playgrounds / Parks / Athletic Fields

$395,953.00

Public - City

Paving, Renovation, Site Work

34

10

4

9

Subscribe For Documents

69 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
281
Active Projects
142
Bidding Soon
2,784
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.