Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 10, 2025 at 8:00 PM
Updated September 11, 2025
Site work for a water / sewer project in Houston, Texas. Completed plans call for site work for a water / sewer project.
In general this work consists of: Pre-Televising of lines to be repaired by point repair and cured-in-place pipe. Pipe bursting of sanitary sewer lines including service reconnections in kind, drop stack reconnections, and cleanout replacements. Rehabilitation of sanitary sewer lines using the Cured-In-Place Pipe (CIPP) method including external service reconnections in kind. Rehabilitation of partially cast-iron sanitary sewer line with tuberculation. Note: Cast iron may be under pavement. Point repair of sanitary sewer lines. Contractor is responsible for obtaining any and all permits required for street cuts. Television inspection of sewer lines after completion of rehabilitation work. Cleaning and preparation of sanitary sewer manholes prior to rehabilitation, including removing existing liners, debris, etc. Repair of sanitary sewer manholes including cementitious lining, removing and replacing frame and cover, raising sanitary sewer manholes, repair of bench and invert, and grouting exterior of manhole frames. Coordinating with District Operations Staff and Engineer to reduce and maintain flow from lift stations into the sanitary sewer system in order for rehabilitation work to be performed. Site restoration including removing and replacing concrete sidewalks and pavement including driveways, roadways, curb, gutter, damaged turf, plants, shrubs, fences, and trees, as required. Implementation and maintenance of traffic control and bypass pumping when necessary or required. Contractor to note that these plans may not include all necessary Traffic Control Plans. Contractor to ensure traffic control is executed as necessary to facilitate work. Contractor is responsible for obtaining any and all permits required for traffic control. Performing trench safety as required per section 01561. PROJECT NO. 125-10074-000
Post-Bid
Water / Sewer
$500,000.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 9, 2025
October 9, 2025
To Be Determined, Houston, TX
Related To This Project
Houston, TX
Bid Date: Sep 23 2025
Houston, TX
Bid Date: Sep 09 2025
Houston, TX
--
Houston, TX
--
Houston, TX
Bid Date: Sep 10 2025
Houston, TX
Bid Date: Sep 09 2025
Houston, TX
Bid Date: Sep 05 2025
Houston, TX
--
Houston, TX
--
Houston, TX
--
Houston, TX
--
Houston, TX
Bid Date: Sep 09 2025
Houston, TX
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
