BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 18, 2025 at 7:00 PM

Updated November 19, 2025

Site work for a civil project in Wildwood, Florida. Completed plans call for site work for a water / sewer project.

**As of November 18, 2025, the project was awarded to CLEARWATER SOLUTIONS, LLC, with an awarded amount of $144,677.45** Question Deadline 09/17/2025 All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Questions received less than seven days prior to the date for opening of Bids may not be answered. The City of Wildwood is seeking bids from qualified contractors for the installation of a new pressure/ flow control valve, control valve controller, flow meter, pressure gauges and 6 ductile iron pipe, along with the required control panel upgrades and system integration. Included in this bidding opportunity is the demolition of the existing valve assembly, flow meter, well pump, piping, and potable supply well per the contract documents. Furnish, delivering, and installing all materials, equipment, and services, including labor for the work of installing a new pressure/flow control valve, control valve controller, flow meter, pressure gauges and 6" ductile iron pipe, along with the required control panel upgrades and system integration. Demolition of the existing valve assembly, flow meter, well pump, piping, and potable supply well per the contract documents. City of Wildwood will receive sealed bids for construction of the CCC WTP NO.1 DECOMMISSIONING. All contractors licensed by the State of Florida are hereby invited to submit a bid on the above-mentioned project CONTRACT TIME: Construction time to achieve Substantial Completion is 90 consecutive calendar days from the date of the Notice to Proceed, with an additional 30 consecutive calendar days to achieve Final Completion. Total construction duration is 120 consecutive calendar days. A 5% bid bond is required for this project, to be submitted with bids. The Owner will require that the Contractor furnish a Performance and Payment Bond in an amount equal to 100% of the Contract Price. All Payment and Performance Bonds shall be secured from or countersigned by an agency or surety company recognized in good standing and authorized to do business in the State of Florida.

Award

Water / Sewer

$144,677.00

Public - City

Site Work

15

14

4

6

Subscribe For Documents

34 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
362
Active Projects
172
Bidding Soon
2,555
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 24, 2025

November 24, 2025

Project location map

To Be Determined, Wildwood, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.