Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published November 18, 2025 at 7:00 PM
Updated November 19, 2025
Site work for a civil project in Wildwood, Florida. Completed plans call for site work for a water / sewer project.
**As of November 18, 2025, the project was awarded to CLEARWATER SOLUTIONS, LLC, with an awarded amount of $144,677.45** Question Deadline 09/17/2025 All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Questions received less than seven days prior to the date for opening of Bids may not be answered. The City of Wildwood is seeking bids from qualified contractors for the installation of a new pressure/ flow control valve, control valve controller, flow meter, pressure gauges and 6 ductile iron pipe, along with the required control panel upgrades and system integration. Included in this bidding opportunity is the demolition of the existing valve assembly, flow meter, well pump, piping, and potable supply well per the contract documents. Furnish, delivering, and installing all materials, equipment, and services, including labor for the work of installing a new pressure/flow control valve, control valve controller, flow meter, pressure gauges and 6" ductile iron pipe, along with the required control panel upgrades and system integration. Demolition of the existing valve assembly, flow meter, well pump, piping, and potable supply well per the contract documents. City of Wildwood will receive sealed bids for construction of the CCC WTP NO.1 DECOMMISSIONING. All contractors licensed by the State of Florida are hereby invited to submit a bid on the above-mentioned project CONTRACT TIME: Construction time to achieve Substantial Completion is 90 consecutive calendar days from the date of the Notice to Proceed, with an additional 30 consecutive calendar days to achieve Final Completion. Total construction duration is 120 consecutive calendar days. A 5% bid bond is required for this project, to be submitted with bids. The Owner will require that the Contractor furnish a Performance and Payment Bond in an amount equal to 100% of the Contract Price. All Payment and Performance Bonds shall be secured from or countersigned by an agency or surety company recognized in good standing and authorized to do business in the State of Florida.
Award
Water / Sewer
$144,677.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 24, 2025
November 24, 2025
To Be Determined, Wildwood, FL
Related To This Project
Wildwood, FL
Bid Date: Sep 22 2025
Wildwood, FL
Bid Date: Oct 14 2025
Wildwood, FL
Bid Date: Oct 07 2025
Wildwood, FL
Bid Date: Oct 15 2025
Wildwood, FL
Bid Date: Oct 27 2025
Wildwood, FL
Bid Date: Dec 04 2025
Wildwood, FL
Bid Date: Dec 10 2025
Wildwood, FL
Bid Date: Dec 03 2025
Wildwood, FL
Bid Date: Sep 11 2025
Wildwood, FL
Bid Date: Sep 25 2025
Wildwood, FL
Bid Date: Jul 01 2025
Wildwood, FL
Bid Date: Jun 11 2025
Wildwood, FL
Bid Date: Jun 10 2025
Wildwood, FL
Bid Date: May 29 2025
Wildwood, FL
Bid Date: May 20 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
