BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 14, 2025 at 7:00 PM

Updated November 15, 2025

Site work for a water / sewer project in Farmer City, Illinois. Completed plans call for site work for a water / sewer project.

Sewer Pump Station, Water Utilities, Sewer Force Main, Sewer and Water Construction, Water Transmission Pipelines, Waterlines, Electrical Installation/Construction, Electrical Equipment & Supplies, Electrical. Construction of a new 220 gpm duplex submersible sanitary pump station with a stand-by diesel generator, including 737 LF of 6-inch PVC force main and 785 LF of 8-inch PVC sanitary sewer and ancillary manholes. The Project also includes construction of 1,600 LF of 8-inch SDR 21 PVC water main and associated valves and fittings. Also included is an extension of underground primary electrical service with transformers into an undeveloped area of Farmer City. The Project consists of the construction of Water and Sewer Utility Extensions including Sanitary Lift Station structures, equipment, piping, electrical, monitoring, controls and related work for the complete improvement as shown on the Drawings and described here within the specifications. Doc note : On this page, projects ads will be listed in the left-hand column with project numbers assigned by online. City of Farmer City Utility Extensions and New Sanitary Pump Station project and download a complete set of bidding documents from this page for a non-refundable fee of $25.00. The designated website will be updated periodically with addenda, lists of registered plan holders, reports, and other information relevant to submitting a Bid for the Project. All official notifications, addenda, and other Bidding Documents will be offered only through the designated website. Neither Owner nor Engineer will be responsible for Bidding Documents, including addenda, if any, obtained from sources other than the designated website. Question Deadline 09/17/2025 All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Questions received less than seven days prior to the date for opening of Bids may not be answered. Only questions answered by Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect. The Work will be substantially completed on or before July 1, 2026 ; Final completion- July 31, 2026. A pre-bid conference for the Project will not be held.

Award

Water / Sewer

$1,224,000.00

Public - City

Site Work

28

22

16

5

Subscribe For Documents

26 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
186
Active Projects
74
Bidding Soon
1,224
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 26, 2025

October 27, 2025

Project location map

Multiple Locations, Farmer City, IL


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.