Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published October 2, 2025 at 8:00 PM
Updated October 3, 2025
Renovation of a multi-residential development in Bellevue, Washington. Completed plans call for the renovation of a 6,027-square-foot multi-residential development.
A. Project Identification: Timberwood Truss Reinforcement B. Project Location: 3809 148th Ave NE, Bellevue, WA 98007 1. Building H: Truss Replacement C. Work includes but is not limited to 1. Good faith asbestos inspection(s) and testing to comply with RCW 49.26.013 as required to achieve scope of work. 2. Removal of all existing insulation within attic work area as required to evaluate existing trusses and review existing mechanical, electrical, and plumbing items. 3. Temporary disconnection or relocation of all existing electrical, mechanical or plumbing items such as wires, piping and ducting in the attic space which hinder work scope, or which could be damaged during Work. 4. Any disruptions to tenant mechanical, electrical, or plumbing items require advanced coordination and notification prior to Work. Contractor to coordinate with Property Manager to determine applicable notice requirements. 5. Inspect existing duct connections and ducting and repair or replace as necessary. 6. Submit truss package design and engineering from the manufacturer and receive approval from the architect and city inspector prior to ordering truss package. 7. Install new trusses per design and permit requirements. 8. Reconnect or reinstall all electrical, mechanical, or plumbing items which were previously disconnected or relocated. All mechanical, electrical, or plumbing items to be restored to working order. 9. Install new insulation to code minimum (R-60). 10. Inspect all exposed roof framing for any rot or damaged materials and repair as needed. 11. Ensure Work is weather protected at end of every work shift and adequately secured. 12. Haul away and dispose of all debris and demolished materials. 13. Daily cleaning and final cleaning of all trash and debris. 14. Prevailing wage rates to be included. 15. Provide all applicable permits. Question Deadline 09/11/2025 at 9:00 AM PT Questions pertaining to the bid are to be sent via email to MichelleJ@kcha.org no later than seven (7) calendar days prior to bid due date. All responses shall be in the form of Addenda. Work includes, but is not limited to, removal of all existing insulation within attic work area as required to evaluate existing trusses and review existing mechanical, electrical, and plumbing items, and other tasks as described in the bid documents. KCHA is seeking qualified contractors interested in submitting bids for Truss Replacement at Timberwood Apartments.Work consists of the removal of all existing insulation within attic area as required to evaluate existing trusses and review existing mechanical, electrical, and plumbing items and other tasks as indicated in the bid docs. If you have questions, please contact Mic.helleJ@kcha.org.
Award
Multi-Residential
$97,439.00
Public - County
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 18, 2025
October 20, 2025
3809 148th Ave NE, Bellevue, WA
Related To This Project
Bellevue, WA
Bid Date: Sep 11 2025
Bellevue, WA
Bid Date: Sep 18 2025
Bellevue, WA
Bid Date: Sep 25 2025
Bellevue, WA
--
Bellevue, WA
--
Bellevue, WA
Bid Date: Oct 08 2025
Bellevue, WA
Bid Date: Sep 25 2025
Bellevue, WA
--
Bellevue, WA
Bid Date: Sep 10 2025
Bellevue, WA
Bid Date: Sep 09 2025
Bellevue, WA
Bid Date: Aug 14 2025
Bellevue, WA
Bid Date: Aug 28 2025
Bellevue, WA
Bid Date: Aug 28 2025
Bellevue, WA
Bid Date: Aug 20 2025
Bellevue, WA
Bid Date: Aug 21 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
