BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 18, 2025 at 8:00 PM

Updated September 19, 2025

Site work and paving for a road / highway in Greenville, North Carolina. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The Engineering Department is accepting bids for the speed cushion installation project. Questions about this bid should be directed to Stacey Pigford, P.E. Civil Engineer II via email: spigford@greenvillenc.gov. The City of Greenville, NC (City) is in need of a contractor to install speed cushions along designated streets in Greenville, NC. All work and materials shall be in accordance with the provisions of the General Guidelines of this contract, the Project Special Provisions, the North Carolina Department of Transportation Standard Specifications for Roads and Structures, the North Carolina Department of Transportation Roadway Standards Drawings, the current edition of the Manual of Uniform Traffic Control Devices (MUTCD), and the Traffic Signal Specifications and all addenda. The Contractor shall keep himself fully informed of all Federal, State and local laws, ordinances, and regulations. The work entails drilling, epoxy and lag bolting the speed cushions to the pavement. The City has done their due diligence and are unaware of any subsurface conditions that would necessitate a change to the normal installation process (see Attachment D). All of the materials required to complete the installation described above will be provided by the City, but the Contractor shall be responsible for picking up the materials at the Public Works Compound, Building E. The anticipated equipment required for the installation includes: o Vehicles to transport the materials from PW to the job site; o Pick-up trucks to haul the actual tools required o Compressed air to clean area and drill holes o Portable drills (chargeable) o Regular electric drills o Gas powered generators to power the electric drills o Drill bits (to be defined with selected Contractor) o Caulking guns It is assumed that the contractor will also provide the traffic control to install each location. It is also assumed based on the locations on residential streets, that traffic control can be accomplished by a standard flagging operation. The locations will be located in the field by City staff. Traffic technicians will be onsite to direct the Contractor on the installation process. Questions must be asked in writing via email addressed to Stacey Pigford at spigford@greenvillenc.gov with the IFB number 25-26-11 mentioned in the subject line of the email. All questions must be submitted by Wednesday, September 3, 2025 by 12:00 noon, and answers will be provided via an addendum posted on the City's website. Location: Various locations along neighborhood streets in the City of Greenville.

Bid Results

Roads / Highways

$22,428.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
149
Active Projects
81
Bidding Soon
1,015
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 12, 2025

October 13, 2025

Project location map

Multiple Locations, Greenville, NC

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.