BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 29, 2025 at 8:00 PM

Updated October 30, 2025

Site work for a road / highway in Wildomar, California. Completed plans call for site work for a road / highway.

Furnishing all labor, material, tax, transportation, equipment, and services necessary for the: BUNDY CANYON ROAD AND HARVEST WAY TRAFFIC SIGNAL PROJECT & SIGNALIZED INTERSECTION IMPROVEMENTS PROJECT (CIP 088/089) Installation of new traffic signals and equipment. This includes, but is not limited to: Installation of new traffic signal poles and video detection equipment, modification of traffic signals, install illuminated street name signs, removal of street lights, construct AC Dike, removal and install signing and striping at designated locations shown on the plans, and all items not mentioned but indicated in the Plans, Specifications, and the Technical Specifications within the Contract Documents. The proposed work shall be performed in accordance with the Project Description, Scope of Work, and other specifications listed in the Request for Proposal. The successful bidder must possess a current Class A Contractor's License issued by the State of CA. Questions and inquires may be submitted in writing via e-mail until 5:00 pm on Thursday, August 28, 2025 to Cameron Luna, Project Manager at cluna@cityofwildomar.org. All responses will be made available to all bidders. For more information, contact: Cameron Luna (951) 677-7751 x245

Award

Roads / Highways

$927,027.00

Public - City

Site Work

9

9

2

4

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
607
Active Projects
221
Bidding Soon
3,970
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 9, 2025

October 9, 2025

Project location map

Harvest Way & Bundy Canyon Rd, Wildomar, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.