Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published January 13, 2026 at 7:00 PM
Updated January 14, 2026
Site work for a water / sewer project in Cameron, South Carolina. Completed plans call for site work for a water / sewer project.
The Cameron Reach Water Main Contract consists of furnishing, installing, and placing into successful operation approximately 65,000 linear feet of 12-inch diameter water main pipe and 1,000 linear feet of 8-inch diameter water main pipe, along with all associated work. The contract includes all pipe, valves, appurtenances, roadway bores, horizontally directionally drilled pipe, backfill, compaction, testing, quality control, safety, and all other related work required to place the project into successful operation. This contract will be a portion of the Lake Marion Regional Water System, with portions owned, operated, and maintained by both Santee Cooper and Calhoun County. The contractor will be responsible for coordinating work with local utility owners, property owners, Lake Marion Water Treatment Plant personnel, and Calhoun County. Location: Calhoun County, South Carolina Mailing Address: Calhoun County, SC - 102 Courthouse Drive, St. Matthews, SC 29135 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Award
Water / Sewer
$16,471,000.00
Public - Federal
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 24, 2025
January 26, 2026
To Be Determined, Cameron, SC
Related To This Project
Cameron, SC
Bid Date: Feb 18 2026
Cameron, SC
Bid Date: Dec 09 2025
Cameron, SC
Bid Date: Apr 11 2025
Cameron, SC
--
Cameron, SC
Bid Date: Jan 31 2025
Cameron, SC
Bid Date: Nov 15 2024
Cameron, SC
Bid Date: Aug 14 2024
Cameron, SC
Bid Date: Mar 30 2021
Cameron, SC
Bid Date: Sep 15 2023
Cameron, SC
Bid Date: Sep 15 2023
Cameron, SC
Bid Date: Jun 02 2022
Cameron, SC
Bid Date: May 06 2022
Cameron, SC
Bid Date: Sep 14 2022
Cameron, SC
Bid Date: Sep 01 2022
Greenville, SC
Bid Date: Oct 24 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
