Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published August 26, 2025 at 8:00 PM
Updated August 27, 2025
Renovation of a military facility in Maywood, Illinois. Working plans call for the renovation of a military facility.
NAICS Code: 236220 - Commercial and Institutional Building Construction Small Business Size Standard: $45 million Set-Aside: 100% Service-Disabled Veteran-Owned Small Business (SDVOSB) Magnitude (FAR 36.204): Between $1,000,000 and $5,000,000 Project Overview: Location: Building 37NW, 5000 S. 5th Ave, Hines, IL 60141 Purpose: HVAC and storm drain system corrections at the EPS Warehouse to ensure a reliable pharmaceutical storage environment. Scope Includes: General construction HVAC systems Electrical and low voltage Concrete, metals, finishes Moisture protection Openings and demolition Commissioning and training Work Hours: Monday-Friday, 7:00 AM to 4:00 PM (excluding federal holidays) Weekend work requires prior written approval. Project Sequence: Pre-proposal Site Visit Proposal Submission Award Kick-off Meeting Notice to Proceed Bonding & Insurance Plans, Security, Schedule Permits (if needed) Construction & Commissioning Final Inspection & Punch List Acceptance O&M Manuals and Training AutoCAD Drawings Progress Payments Warranty Key Deliverables: Period of Performance: 120 calendar days post Notice to Proceed (dependent on HVAC lead times) Bonds & Insurance: Due within 10 calendar days of award Contractor Quality Control Plan (CQCP): Due within 30 days of Notice to Proceed Interim plan acceptable for first 45 days Project Schedule: Critical Path Method (CPM) schedule required Safety Plan: Site-specific, must be approved before mobilization Progress Reports & Meetings: Weekly or bi-weekly updates and meetings Permits: Contractor responsible for any required permits (e.g., helicopter delivery) O&M Manuals & Training: As per specifications Warranty Plan: Due 30 days before pre-warranty conference The Method of Contractor Selection has not been determined at this Time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Final Planning
Military
$5,000,000.00
Public - Federal
Renovation
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 27, 2025
Roosevelt Rd & S 5th Ave, Maywood, IL
Related To This Project
Maywood, IL
Bid Date: Oct 01 2025
Maywood, IL
Bid Date: Nov 07 2025
Maywood, IL
Bid Date: Jan 16 2026
Maywood, IL
Bid Date: Oct 17 2025
Maywood, IL
Bid Date: May 08 2026
Maywood, IL
--
Maywood, IL
Bid Date: Mar 27 2026
Maywood, IL
Bid Date: Jun 17 2025
Maywood, IL
--
Maywood, IL
Bid Date: Mar 27 2025
Maywood, IL
Bid Date: Apr 04 2025
Maywood, IL
Bid Date: Apr 04 2025
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed