Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 22, 2025 at 8:00 PM
Updated September 23, 2025
Demolition, site work and renovation of a municipal facility in Green Lake, Saskatchewan. Completed plans call for the renovation of a municipal facility; for the demolition of a municipal facility; and for site work for a municipal facility.
The Northern Settlement of Sled Lake's community hall kitchen requires demolition, disposal, and a new reheat kitchen built. The community hall is located on lot MR3, block 4, plan 102076310 within the settlement. The new kitchen addition is to be built in the same location as the current kitchen. The kitchen and deck are to be built according to the supplied engineered drawings. The engineered drawings are for an RTM build. The option for an on-site build is available, but it needs to generally follow the provided layout. Any deviation from the drawings must be approved by the District Public Works Manager before the change. Deliverables: Northern Municipal Services, on behalf of the District (a northern incorporated municipality) is requesting proposals from contractors for the demolition and rebuild of a community hall kitchen in the Northern Settlement of Sled Lake. The hall kitchen is attached to the northeast side of the community hall. At minimum, the successful contractor will be responsible for the following: Complete the site visit(s) necessary to assess project needs Provide all lodging, meal, and travel costs to complete the site visit(s) necessary to perform the demolition and build. Work with District officials to coordinate access to the site(s). Demolition and proper disposal of current community hall kitchen off site at an approved Regional Landfill Supply all materials and tools required to complete the demolition Remove all surplus materials, tools, equipment, and debris post-demolition. Oversee, hire, and include all subcontractors in their bid Clean up and site preparation for new community hall kitchen Build new community hall kitchen & deck according to supplied engineered drawings (see Appendix A for supplied engineered drawings) Ensure permits, routes, logistics, insurance coverage etc., are in place for hauling the RTM to Sled Lake Adhere to all applicable codes and bylaws. Arrange and complete all required building inspections Supply all materials and to complete the new build Supply all applianc Documents are available at www.sasktenders.ca
Post-Bid
Municipal
$100,000.00
Public - State/Provincial
Demolition, Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 22, 2025
October 22, 2025
Lot MR3, block 4, Plan 102076310, Green Lake, SK
Related To This Project
Green Lake, SK
Bid Date: Apr 23 2025
Green Lake, SK
Bid Date: Sep 13 2024
Green Lake, SK
Bid Date: Jul 16 2024
Green Lake, SK
Bid Date: Dec 30 2025
Green Lake, SK
Bid Date: Dec 18 2023
Green Lake, SK
Bid Date: Jul 07 2023
Green Lake, SK
Bid Date: Jun 26 2023
Green Lake, SK
Bid Date: Jun 13 2023
Green Lake, SK
Bid Date: May 15 2023
Green Lake, SK
Bid Date: May 16 2023
Green Lake, SK
Bid Date: Apr 13 2023
Green Lake, SK
Bid Date: Apr 12 2022
Ile-a-la-Crosse, SK
Bid Date: Sep 11 2025
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
