Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 18, 2025 at 8:00 PM
Updated September 19, 2025
This is a service / maintenance or supply contract in Sacramento, California. Contact the soliciting agency for additional information.
This Request for Proposal (Rfp) is to Establish Annual Contracts for on-call Pump Station Repair/replacement/installation/inspection Services as Required By the Sacramento Area Sewer District (Sacsewer). Specifically, Sacsewer Seeks to Obtain Several Primary Contractors to Perform the Work Described Under Each Scope of Work. All Work Furnished Must Be Provided in Accordance With Contract Specifications and Terms and Conditions Set Forth Herein. Sacsewer Reserves the Right to Extend the Contract Period for Two (2) Additional One-year Periods. Such Extension(S) Will Be at Sacsewer's Option, Subject to Current Specifications, Terms, Conditions, Favorable Prices, and Agreement Between the Contractor and Sacsewer. SacSewer anticipates 50 projects requiring pump station repairs to be completed in the next three (3) years,with an estimated cost of $1 million per year. The cost per year is estimated, and the specific number of projects and estimated costs may be more or less. To complete these projects promptly and to reduce time and effort to submit, propose, and review proposals, SacSewer is creating a Contractor List for ON-CALL PUMP STATION REPAIR SERVICES to supplement SacSewer staff. SacSewer will choose Contractors placed on the list to provide bids or cost estimates for projects as needed. These projects include, but are not limited to, the following: Repair/replace/install pressurized and gravity pipe, fittings, tees, bends, etc. for wastewater, potable water, non-potable water, and site drainage systems. Replace/install valves, backflow preventers. System activation or abandonment for equipment systems and associated pipes and conduit, such as surge systems, irrigation, control panels, odor control, etc. Replace/install submersible and dry pumps, pump rails, and pump shoes Replace/install flow meters for pressurized pipes. Repair/replace/install air relief valves. Repair/replace/install conduit. Repair/replace/install concrete structures or supports. Locate existing underground piping or assets by potholing, television inspection (TVI), or any practical means as approved by SacSewer. General inspection of pipes, appurtenances, structures such as vaults, pipelines, or ARVs. Contractor proposals will be evaluated using the following scopes of work and ranked using criteria discussed further in the RFP. Selected contractors will be placed on the list(s) and will only be solicited for work under the scopes in which they were selected. The County of Sacramento Labor Compliance Section will act as an agent of the Sacramento Area Sewer District and monitor this project for compliance. All questions regarding prevailing wage requirements should be directed to the Labor Compliance Section at (916) 875-2711. Pursuant to California Labor Code Section 1720 and following, and Section 1770 and following, the successful bidder shall pay not less than the prevailing rate of per diem wages as determined by the Director of the California Department of Industrial Relations. Copies of the prevailing wage determinations are on file at the office of the County of Sacramento Labor Compliance Program, 9700 Goethe Road, Suite D, Sacramento, CA 95827, and are also available on the internet at online Contractors are hereby notified that pursuant to Part 7, Chapter 1, Article 2, Section 1770, et seq., of the Labor Code of the State of California, the successful Contractor and its subcontractors shall pay their labor forces not less than the general prevailing rate of wages as determined by the Director of the Department of Industrial Relations, and travel and subsistence pay as such are defined in applicable collective bargaining agreements filed in accordance with Section 1773.8 of said Labor Code, for work needed and performed on this project. It shall, pursuant to the provisions of Section 1773.2 of said Labor Code, be a requirement of the work for the successful bidding contractor to post and maintain a copy of said wages' determinations at the project site throughout the duration of the work. SacSewer reserves the right to reject any or all Proposals and waive any irregularity in Proposals received. Question Deadline 09/04/2025 at 3:00 PM PT All questions regarding prevailing wage requirements should be directed to the Labor Compliance Section at (916) 875-2711.
Post-Bid
Water / Sewer
Public - County
Service, Maintenance and Supply
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 18, 2025
September 26, 2025
Multiple Locations, Sacramento, CA
Related To This Project
Sacramento, CA
Bid Date: Oct 09 2025
Sacramento, CA
Bid Date: Oct 24 2025
Sacramento, CA
Bid Date: Oct 08 2025
Sacramento, CA
Bid Date: Sep 23 2025
Sacramento, CA
Bid Date: Oct 13 2025
Sacramento, CA
--
Sacramento, CA
Bid Date: Oct 14 2025
Sacramento, CA
Bid Date: Oct 21 2025
Sacramento, CA
Bid Date: Sep 17 2025
Sacramento, CA
--
Sacramento, CA
Bid Date: Oct 08 2025
Sacramento, CA
Bid Date: Oct 01 2025
Sacramento, CA
Bid Date: Oct 01 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
