BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 2, 2025 at 8:00 PM

Updated October 3, 2025

Site work for a stadium in Sacramento, California. Working plans call for site work for a stadium.

**As of October 2, 2025,no proposals received. No definite date for the rebid.** A 22,000-seat NCAA Football Stadium which includes infrastructure, new artificial field, modular seating, modular locker rooms/restrooms/showers/changing facilities, scoreboard and press box. The current grandstands offer seating capacity at around 5,000 seats. Project will consist of adding an additional 17,000 seats. This Project is a public works project and is subject to prevailing wage rate laws (Contract General Conditions, Article 36.02). Direct any prequalification questions to the Trustees' Prequalification Administrator at cocm.prequal@calstate.edu. When it nears time to bid trades, the selected design-builder shall contact the Trustees' DVBE Coordinator Shon Tilby, at (916) 278-5797, shon.tilby@csus.edu. The State of California, acting through the Board of Trustees of The California State University, hereinafter called Trustees or BOT, on behalf of Sacramento State University, hereinafter called University, is seeking Design-Builders (Proposers) to provide design and construction services for the project referenced above (Project). The Trustees will select Design-Builder based on qualifications and proposed fees (a design competition is not utilized). Post award, the Design-Builder and the University will work to jointly select an Architect based on qualifications and proposed design fees (best value). The University will then issue a modification to the Phase 1 agreement to reflect the final design fee. Currently the University is requesting that interested bidders who are not already prequalified with CSU or who may need to request a prequalification limit increase, start the prequalification process. The formal Request for Qualifications is forthcoming, however interested proposers should not wait until the RFQ is posted to start the prequalification process.

Final Planning

Arenas / Stadiums

$171,240,000.00

Public - State/Provincial

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
508
Active Projects
238
Bidding Soon
2,602
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 1, 2025

June 2, 2026

Project location map

6000 Jed Smith Dr, Sacramento, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.