Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published November 20, 2025 at 7:00 PM
Updated November 21, 2025
Demolition, site work, paving and new construction of a bridge / tunnel in Sault Sainte Marie, Michigan. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
Bridge reconstruction including removal and replacement and approach work on M-129 over Fletcher Creek, Chippewa County. 5% Dbe Participation Required Net classification required for this project is 2009 Ea or 2009 Fa In addition to the above minimum prequalification requirement for prime contractors this project includes a subclassification of Fa. If the prime contractor is not prequalified in this subclassification it must use a prequalified subcontractor. This subcontractor must be designated prior to award of the contract to the confirmed low bidder. Control Sec Job No Federal No BFP 17072 220528A 24A0441 MIDOT - 2511 005 - Bridge Reconstruction Including Removal and Replacement and Approach Work on M-129 Question Deadline 10/31/2025
Award
Bridges / Tunnels
$1,579,774.00
Public - State/Provincial
Demolition, New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 7, 2025
March 9, 2026
M-129, Sault Sainte Marie, MI
Related To This Project
Sault Sainte Marie, MI
Bid Date: Nov 07 2025
Sault Sainte Marie, MI
Bid Date: Nov 05 2025
Sault Sainte Marie, MI
Bid Date: Dec 05 2025
Sault Sainte Marie, MI
Bid Date: Nov 07 2025
Sault Sainte Marie, MI
Bid Date: Dec 05 2025
Sault Sainte Marie, MI
Bid Date: Dec 17 2025
Sault Sainte Marie, MI
Bid Date: Oct 14 2025
Sault Sainte Marie, MI
Bid Date: Oct 08 2025
Sault Sainte Marie, MI
Bid Date: Sep 17 2025
Sault Sainte Marie, MI
Bid Date: Oct 03 2025
Sault Sainte Marie, MI
Bid Date: Sep 12 2025
Sault Sainte Marie, MI
--
Sault Sainte Marie, MI
Bid Date: Aug 25 2025
Sault Sainte Marie, MI
--
Sault Sainte Marie, MI
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
