BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 10, 2025 at 8:00 PM

Updated September 11, 2025

Renovation of a mixed-use development in Beverly Hills, California. Completed plans call for the renovation of a data center facility; and fire / police facility.

The qualified contractors will be bidding on two separate projects which will not be concurrent. Project 1: Police Facility- EOC UPS 1) Involves replacement of low voltage transformer primary and secondary fused disconnects with adjustable enclosed breakers. 2) Furnish and install a new dedicated UPS with bypass. Project 2: Data Center The project consists of three parts: Part 1 entails the purchase, installation, pre-wiring programming, and load testing of the new 480V 150kW Frame UPS; Part 2 includes the planned Data Center outage to complete the permanent source breaker, conduit, and wiring connections of the new UPS and restoration of the Data Center loads supplied from the new UPS; Part 3 consists of the removal of the existing UPS and other activity to leave the Data Center in the final configuration. Part 3 consists of the removal of the existing UPS and other activity to leave the Data Center in the final configuration. Response Types Response File General Attachment Type of Award Lump Sum License Requirements C-10 Question Deadline 08/29/2025 at 2:00 PM PT Online Q&A Yes

Post-Bid

Fire / Police

$50,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
554
Active Projects
158
Bidding Soon
3,690
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 9, 2025

October 9, 2025

Project location map

Multiple Locations, Beverly Hills, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.