BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 13, 2025 at 8:00 PM

Updated October 14, 2025

Site work and paving for a mixed-use development in Omaha, Nebraska. Completed plans call for site work for a sidewalk / parking lot; and water / sewer project.

The work to be performed in this improvement shall consist of construction of bank stabilization and erosion repair measures for several sites along the South Papillion Creek. Bank Stabilization and erosion repair measures include installation of sheet pile walls, installation of an area inlet, and placement of riprap armoring. The work also includes site preparation and restoration activities required for construction at each site. Approximate Quantities Millard Park Bank Stabilization Sites a and I Item No . Description_ Ouantitv Unit 1. Mobilization / Demobilization 1 Ls 2. Maintain Traffic Control 1 Ls 3. Install Construction Entrance 1 Ea 4. Install Silt Fence 270 Lf 5. Construct Temporary Safety Fence 840 Lf 6. Clearing and Grubbing - General 1 Ls 7. Clearing and Grubbing - Trees Over 9" to 18" Diameter 24 Ea 8. Clearing and Grubbing - Trees Over 18" to 27" Diameter 2 Ea 9. Install, Maintain, and Remove Curb Inlet Protection 1 Ea 10. Remove Topsoil 320 Sy 11. Remove Timber Pile Support 1 Ea 12. Remove 18" Rcp 16 Lf 13. Excavation Haul-off - Established Quantity 430 Cy 14. Construct 3" Perforated Underdrain Pipe 145 Lf 15. Construct Sheet Pile 4,452 Sf 16. Construct 24" Area Inlet Nyoplast Dome Grate 1 Ea 17. Install 24" Nyoplast Sump Insert 1 Ea 18. Construct 24" Hdpp 40 Lf 19. Construct 24" Fes 1 Ea 20. Construct Type ' B' Riprap 80 Ton 21. Construct Type 'c' Riprap 17 Ton 22. Construct G Routed Riprap 50 Ton 23. Construct Timber Pile Support 1 Ea 24. Repair 4" Pcc Sidewalk 105 Sf 25. Repair Curb and Gutter 35 Lf 26. Place Topsoil 770 Sy 27. Install Seeding - Type 'channel Seed Blend' 770 Sy 28. Install Rolled Erosion Control - Type I 770 Sy 29. Install Seeding - Type 'b Seed Blend' 2,110 Sy 30. Install Mulching 2,110 Sy 31. Install Red Sunset Maple Plant Material 5 Ea 32. Install Swamp White Oak Plant Material 4 Ea 33. Install Princeton Sentry Ginkgo Plant Material 1 Ea 34. Install Colorado Blue Spruce Plant Material 3 Ea 35. Site D Restoration 1 Ls Millard Park Bank Stabilization Site E Item No . Description_ Ouantitv Unit 1. Mobilization / Demobilization 1 Ls 2. Maintain Traffic Control 1 Ls 3. Install Construction Entrance 1 Ea 4. Install Silt Fence 100 Lf 5. Construct Temporary Safety Fence 230 Lf 6. Clearing and Grubbing - General 1 Ls 7. Clearing and Grubbing - Trees Over 9" to 18" Diameter 11 Ea 8. Clearing and Grubbing - Trees Over 18" to 27" Diameter 3 Ea 9. Remove and Reinstall Fence 200 Lf 10. Install, Maintain, and Remove Curb Inlet Protection 2 Ea 11. Remove and Reinstall Sign 1 Ea 12. Remove Topsoil 260 Sy 13. Embankment Borrow 30 Cy 14. Construct Sheet Pile 5,320 Sf 15. Construct 3" Perforated Underdrain Pipe 120 Lf 16. Repair 4" Sidewalk - Large Area 1,105 Sf 17. Repair Multi-use Trail 1,605 Sf 18. Repair Curb and Gutter 5 Lf 19. Place Topsoil 560 Sy 20. Install Seeding - Type 'channel Seed Blend' 560 Sy 21. Install Rolled Erosion Control - Type I 560 Sy 22. Install Seeding - Type 'b Seed Blend' 1,660 Sy 23. Install Mulching 1,660 Sy 24. Install Swamp White Oak Plant Material 3 Ea 25. Install Princeton Sentry Ginkgo Plant Material 1 Ea 26. Install Norway Maple Plant Material 4 Ea 27. Install Colorado Blue Spruce Plant Material 3 Ea Millard Park Bank Stabilization Sites F and G Item No . Description_ Ouantitv Unit 1. Mobilization / Demobilization 1 Ls 2. Maintain Traffic Control 1 Ls 3. Install Silt Fence 70 Lf 4. Construct Temporary Safety Fence 1,510 Lf 5. Clearing and Grubbing - General 1 Ls 6. Clearing and Grubbing - Trees Over 9" to 18" Diameter 14 Ea 7. Clearing and Grubbing - Trees Over 18" to 27" Diameter 3 Ea 8. Clearing and Grubbing - Trees Over 27" to 36" Diameter 1 Ea 9. Remove Welded Wire Fence 1,730 Lf 10. Remove Abandoned Posts 5 Ea 11. Remove Topsoil 1,130 Sy 12. Embankment Borrow - Established Quantitiy 1,580 Cy 13. Construct Sheet Pile 15,650 Sf 14. Construct 3" Perforated Underdrain Pipe 420 Lf 15. Construct Riprap Bedding 50 Ton 16. Construct Type 'c' Rock Rip-rap 835 Ton 17. Construct Welded Wire Fence 740 Lf 18. Place Topsoil 2,010 Sy 19. Install Seeding - Type 'channel Seed Blend' 1,830 Sy 20. Install Rolled Erosion Control - Type I 1,830 Sy 21. Install Seeding - Grid Iron 80/20 Mix 3,450 Sy 22. Install Mulching 3,450 Sy All Proposals Must Be Submitted on Bid Forms Furnished by E & a Consulting Group, Inc., and Must Be Accompanied by an Original Bid Bond or a Certified Check in the Amount Not Less Than $142,080.00 Made Payable to the Treasurer of Sanitary and Improvement District 162 as Security That the Bidder to Whom the Contract May Be Awarded Will Enter Into a Contract to Build the Improvements in Accordance With This Notice to Contractor and Will Give a Contract and Maintenance Bond in the Amount of 100% of the Total Contract Price, All as Provided in the Specifications. Sanitary and Improvement District 162 of Sarpy County, Nebraska, Reserves the Right to Reject Any or All Bids Received and to Waive Informalities and Irregularities.

Award

Water / Sewer

$1,599,836.00

Public - County

Paving, Site Work

41

7

2

5

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
146
Active Projects
96
Bidding Soon
958
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 16, 2025

November 17, 2025

Project location map

S 11th St, Omaha, NE

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.