BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 10, 2025 at 7:00 PM

Updated November 11, 2025

Site work for a water / sewer project in North Andover, Massachusetts. Completed plans call for site work for a water / sewer project.

The following work is being proposed at the Sutton Hill Booster Pump Station in North Andover, MA: Process Mechanical improvements including removing and replacing two duty pumps and four check valves, and refurbishing one high flow pump; Electrical, Plumbing, HVAC, and I&C improvements including power and signal wiring, conduit, and appurtenances, buried natural gas piping and a natural gas generator, control panel installation, signal and power wiring termination, disconnect and transfer switches, interior and exterior lighting, CCTV system installation, heat pump system installation, and testing. The booster pump station will be put on temporary potable water bypass for the duration of the work. Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. The Work under this Contract includes improvements to process mechanical, plumbing, HVAC, electrical, and instrumentation & control system, and installation of a new CCTV video security system at the Booster Pump Station as shown in the Contract Drawings and as specified herein. The work includes, but is not necessarily limited to, removing and replacing the two (2) 40-HP centrifugal duty pumps and motors and rehabilitating the one (1) 75-HP centrifugal high flow pump by replacing the high flow pump motor and internal pump wear components specified in the Contract Documents. The work also includes removing and replacing two (2) 6-inch silent check valves, an 8-inch silent check valve, a 10-inch dual disk check valve, buried natural gas piping, a natural gas generator, an automatic transfer switch, and interior and exterior lighting. Additions to the pump station to be installed under this contract include a heat pump system and a CCTV system. Site work includes removal and replacement of the existing generator concrete equipment pad, excavation and backfilling for natural gas piping, and site restoration. Additional work includes selective demolition and temporary bypass pumping, as shown in the Contract Drawings. All proposed work shall be sequenced as described in the Contract Drawings. Question Deadline 10/01/2025 Every request for such interpretation in relation to the general bid work must be in writing addressed to Ben Mangan, PE, Apex Companies, benjamin.mangan@apexcos.com and Eric Kelley, PE, Apex Companies eric.kelley@apexcos.com. To be given consideration requests must be received by the close of business (4pm) at least seven (7) calendar days prior to the date fixed for the opening of general bids.

Award

Water / Sewer

$593,000.00

Public - City

Site Work

17

27

6

6

Subscribe For Documents

68 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
502
Active Projects
191
Bidding Soon
3,979
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 8, 2025

November 7, 2025

Project location map

180 Sutton Hill Rd, North Andover, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.