BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 17, 2025 at 8:00 PM

Updated September 18, 2025

Site work and paving for a mixed-use development in Attleboro, Massachusetts. Completed plans call for site work for a road / highway; sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

The Project consists of but not limited to: Removal and replacement of the existing large block retaining wall with new cast-in-place concrete retaining wall, removal and replacement of metal handrail, removal and replacement of the existing concrete sidewalk/patio, removal and replacement of existing drain line, site restoration The work is estimated to cost $214,450.00. All bidding Requests for Information (RFIs) shall be submitted online by 09/05/2025 at 12:00PM EDT for general bids.

Award

Roads / Highways

$203,000.00

Public - City

Paving, Site Work

8

14

4

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
565
Active Projects
115
Bidding Soon
4,294
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 12, 2025

October 13, 2025

Project location map

80 South Ave, Attleboro, MA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.