BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 7, 2025 at 8:00 PM

Updated October 8, 2025

Site work for a water / sewer project in Greeley, Colorado. Completed plans call for site work for a water / sewer project.

Reference Number 0000397018 The City of Greeley will select a contractor to construct stormwater improvements within and around the city-owned detention pond located near the intersection of West C Street and North 47th Ave. Court in the Weber West Subdivision. The City of Greeley will select a contractor to construct stormwater improvements within and around the city-owned detention pond located near the intersection of West C Street and North 47th Avenue Court in the Weber West Subdivision. Construction activities will include installing a stormwater system, access roads to the detention pond, a pond outlet structure, a riprap rundown, and grading a stormwater conveyance channel. Work will include, but is not limited to: Coordination with utilities. Erosion and sediment control. Clearing and Grubbing. Removal and disposal of asphalt, concrete, and excess fill. Earthwork excavation and embankment. Grading channels. Construction of stormwater system - inlets and pipe. Replacement of sidewalk, crosspan, curb and gutter, and asphalt. Construction of pond access roads. Construction of outlet structure Installation of riprap. Seeding and mulching disturbed areas. Removal of temporary erosion control measures. Other miscellaneous work shown on the Scope of Work document and specified herein. There is no DBE Goal established for this project. Question Deadline 09/18/2025 at 10:00 AM MT Questions are submitted online No, Questions pertaining to the project may be directed to purchasing@greeleygov.com Each bid shall be accompanied, by a certified check drawn on a bank which is insured by the Federal Deposit Insurance corporation or a bidder's bond executed by a surety company authorized to do business in Colorado, made payable to the City of Greeley, Colorado, in an amount not less than five percent (5%) of the proposal sum as security that the successful bidder will enter into a contract to construct this project in accordance with the plans and specifications, and give bonds in the sum as hereafter provided. Checks accompanying bids not accepted will be returned. The successful responsive and responsible bidder will be required to furnish a satisfactory performance bond and payment bond in the amount of the contract sum. No bid shall be withdrawn after the opening on the bids without the consent of the City of Greeley, Colorado, for a period of sixty (60) days after the scheduled time of the receiving the bids. The City of Greeley retains the right to reject any and all bids and to waive any informality as deemed in the best interest of the city.

Bid Results

Water / Sewer

$325,412.00

Public - City

Site Work

15

4

2

6

Subscribe For Documents

147 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
205
Active Projects
82
Bidding Soon
1,343
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.