BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 12, 2026 at 7:00 PM

Updated January 13, 2026

Renovation of a municipal facility in Austin, Texas. Design plans call for the renovation of a municipal facility.

General Main Lobby on level one (historic area) will have no work. No work to café. Add steel canopy and signage outside south basement entry for better visibility. Replace skylights on roof. Coordinate with DM work for additional elevator work. Coordinate with DM work for envelope evaluation and potential window work. Improve occupant health and comfort Improve air quality, daylighting with tie into lighting controls, new blinds with controls from bottom up, upgraded break rooms with more appliances, added mother’s room, new furniture, acoustic mitigation at two story space and in cube areas ensure equitable space allocation. Finishes 1. Assume all concrete columns will be refinished in a manner that looks good, but takes as little dimension as necessary (plaster?) 2. All toilet rooms will receive new flooring walls counters and partitions. 3. All breakrooms will receive new cabinets, quartz counters and stainless steel sinks, TVs and multiple refrigerators minimum 2, 3 where space allows, including additional power and data. All new flooring, ceilings and paint and furniture. 4. All doors will be aluminum frame. Doors into suites, conference rooms and offices to have an 18” - 24” sidelight. (not shown in plans) 5. Add new blinds that pull up from bottom at all exterior windows in occupied areas. 6. New signage to meet Capitol complex sign standards. 7. Flooring to be carpet in office areas, ceramic tile in breakrooms, toilet rooms and elevator lobbies, and LVP in corridors. 8. Ceilings to 2 x 2 suspended grid with gypsum in elevator lobby and conference rooms. Due to the existing floor to floor heights and concrete beams it is expected that some areas may have areas of exposed ducts with acoustic tiles on underside of deck for sound attenuation re extensive gypsum board furrdowns for changes in ceiling levels to accommodate ducts. As of January 12, 2026, a design firm has been selected. A construction document completion timeline has not been released. Further details regareding construction and completion timelines have not been disclosed.

Design

Municipal

$30,900,000.00

Public - State/Provincial

Renovation

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
292
Active Projects
114
Bidding Soon
2,655
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.