Published October 23, 2025 at 8:00 PM
Updated October 24, 2025
Site work and paving for a sidewalk / parking lot in Austin, Texas. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.
As of October 23, 2025, this project has not yet been awarded. The project is expected to be awarded towards the end of November or early December. Reference Number 0000396311 Performance Period: 365 Calendar Days Liquidated Damages: See General Conditions of the Construction Contract, Item 8, Section 8.6 Failure to Complete Work on Time Question Deadline 09/05/2025 at 5:00 PM CT Questions are submitted online Yes Contract Type Overall Goal Construction 19.21% For questions related to the HUB Program Declaration (Declaration) contact: Nicholas Morrow HUB Specialist Phone: (512) 854-9700 Email: hubstaff@traviscountytx.gov SCOPE OF WORK 4.1 Intent of Plans and Specifications It isthe intent of the plans and specificationsto describe a completed work to be performed underthe contract. Unless otherwise provided, the Contractor must furnish all materials, supplies, tools, equipment, supervision, and labor necessary for the proper prosecution and completion of the work. 4.2 Changes and Alterations The Engineer has the right to make changes and alterations in the plans as may be considered necessary or desirable. Such changes and alterations will not be considered as a waiver of any condition of the contract, nor will they invalidate any of the provisions thereof. The Contractor must perform the work as changed or altered. Necessary work resulting in a substantial change in the character of the work will be, upon demand of either party to the contract, considered as Extra Work. Changes made for the convenience of the Contractor will not be considered Extra Work. A substantial change in the character of the work is defined as: (a) A required change in design or specifications which materially affects the unit cost of an item, or (b) A required change in the plans which requires the Contractor to repeat work previously completed, or (c) A required change in the construction methods for a contract item which significantly increases or decreases the amount of equipment, labor, or subordinate materials required to complete the item of work.
Bid Results
Sidewalks / Parking Lot
$3,363,217.00
Public - County
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
9
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 18, 2025
November 17, 2025
Multiple Locations, Austin, TX
Related To This Project
Austin, TX
Bid Date: Sep 09 2025
Austin, TX
--
Austin, TX
--
Austin, TX
--
Austin, TX
--
Austin, TX
Bid Date: Oct 30 2025
Austin, TX
Bid Date: Sep 26 2025
Austin, TX
--
Austin, TX
--
Austin, TX
--
Austin, TX
Bid Date: Aug 28 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.