Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 13, 2025 at 7:00 PM

Updated December 11, 2025

Demolition, site work, paving and new construction of a bridge / tunnel in Current River Township, Missouri. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

**As of October 7th, 2025, this project has not yet been awarded. A timeline for the award has not yet been established.** Replace an aging and inadequate bridge with a new single span box-beam bridge. Est. Completion Date : June 30, 2026 Doc Note : The DBE (Disadvantaged Business Enterprise) contract goals for the amount of work to be awarded for the Ripley County A-3 Bridge Replacement, is 4% of the total project price. The bidder shall also complete the DBE Identification Submittal forms for both projects in accordance with the General Provisions. Missouri Law, 292.675 RSMO, requires any awarded contractor and its subcontractor(s) to provide a ten-hour Occupational Safety and Health Administration (OSHA) Construction Safety Program for their on-site employees. The Owner must award the project to the lowest responsive, responsible bidder. All bidders are required to use the pre-qualification process outlined by MoDOT. See the Missouri Standard Specifications for Highway Construction, Section 102 for additional information. Each Bidder must deposit with his bid, security in the amount, form, and subject to the conditions provided in the Information for Bidders. No Bidder may withdraw his bid within 60 days after the actual date of the bid opening. The Ripley County Commission hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, businesses owned and controlled by socially and economically disadvantaged individuals will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, religion, creed, sex, age, ancestry, or national origin in consideration for an award. Download delivery fee is $30.00, file size is 20 MB .

Award

Bridges / Tunnels

$548,865.00

Public - County

Demolition, New Construction, Paving, Site Work

20

12

5

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
49
Active Projects
27
Bidding Soon
442
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 24, 2025

October 24, 2025

Project location map

Co Rd A-3, Current River Township, MO

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed