Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published August 10, 2026 at 8:00 PM
Updated August 16, 2026
Site work and paving for a bridge / tunnel in John d'or Prairie, Alberta. Conceptual plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
Construction of a new Fly-Over Bridge Carrying Range Road 62 over Highway 43 (C10204). Other work includes realignment of Hwy 43 service road. TIMELINE: RFP for engineering design consultants has closed; whether or not an award has been made is currently unreleased. Tender and construction are not scheduled prior to 2027, at the earliest. Further update may be confirmed early 2027. *Construction cost to be confirmed. Total engineering cost is $995,051.
Conceptual
Bridges / Tunnels
$9,000,000.00
Public - County
Paving, Site Work
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 9, 2027
Range Rd 62, John d'or Prairie, AB
Related To This Project
John d'or Prairie, AB
Bid Date: May 01 2025
John d'or Prairie, AB
Bid Date: Dec 10 2024
John d'or Prairie, AB
Bid Date: Aug 20 2024
John d'or Prairie, AB
--
John d'or Prairie, AB
--
John d'or Prairie, AB
Bid Date: Mar 22 2022
John d'or Prairie, AB
--
Calgary, AB
Bid Date: Sep 17 2025
Red Deer, AB
Bid Date: Sep 11 2025
Edmonton, AB
Bid Date: Sep 11 2025
Sexsmith, AB
Bid Date: Sep 24 2025
Edmonton, AB
Bid Date: Oct 17 2025
Calgary, AB
Bid Date: Sep 29 2025
Calgary, AB
Bid Date: Sep 25 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
