Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 6, 2025 at 8:00 PM
Updated October 10, 2025
Site work for a mixed-use development in El Cajon, California. Completed plans call for site work for a educational facility.
CMAS Procurement: The Owner has purchased synthetic track surfacing and all associated line striping direct under separate contract. Beynon and its installation are not part of the bid. This section is for clarification and in coordination with the general contractor's scope of work and project schedules. A. It shall be the responsibility of the synthetic track surfacing manufacturer to provide all labor, materials, equipment and tools necessary for the complete installation of the synthetic track surfacing system as indicated on the plans and as specified herein. The installation of all materials shall be performed in strict accordance with the manufacturer's installation instructions and in accordance with all approved shop drawings. B. Perimeter edge details required for the system shall be as detailed and recommended by the Manufacturer, and as approved by the Owner. Supply and installation of these details will be under scope of work of the general contractor based on project plans and are not part of the synthetic track surfacing manufacturer / installer's scope. C. The system shall consist of, but not necessarily be limited to, the following: 1. An acceptable subbase including asphalt paving, base rock, concrete curbs and a drainage system to drain the impermeable track surfacing system constructed by the General Contractor per the contract drawings. D. 2. Beynon BSS 300 Track Surfacing System. If any prospective bidder is in doubt as to the true meaning of any part of the Contract Documents, or finds discrepancies in, or omissions, a written request for an interpretation or correction thereof may be submitted to the Charter School. The bidder submitting the request shall be responsible for its prompt delivery. Any interpretation or correction of the Contract Documents will only be made by Addendum duly issued, and a copy of such Addendum will be made available for each Contractor receiving a set of the Contract Documents. Each request for clarification shall be submitted in writing, via email, to only the following persons: TO: JoAnn Koplin (jwkoplin@gmail.com) Ray Rodriguez (rayr@rdzenterprises.com) Each transmitted requestshall contain the name of the person and/or firm filing the request, address, telephone, and email address, Specifications and/or Drawing number. Pre-bid clarification request shall be submitted by 5:00 pm on September 11, 2025. Requests received after this deadline shall not be considered or responded to by the Charter School. A written response to timely pre-bid clarifications requests which materially affect a bidders price will be made by Addendum issued by the EJE Academies Charter School not less than seventy-two (72) hours prior to bid opening
Post-Bid
Educational
$1,700,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 9, 2025
November 3, 2025
Multiple Locations, El Cajon, CA
Related To This Project
El Cajon, CA
Bid Date: Sep 16 2025
El Cajon, CA
Bid Date: Oct 03 2025
El Cajon, CA
Bid Date: Oct 06 2025
El Cajon, CA
Bid Date: Nov 26 2025
El Cajon, CA
Bid Date: Nov 06 2025
El Cajon, CA
Bid Date: Nov 13 2025
El Cajon, CA
Bid Date: Oct 24 2025
El Cajon, CA
Bid Date: Oct 27 2025
El Cajon, CA
Bid Date: Sep 22 2025
El Cajon, CA
Bid Date: Sep 24 2025
El Cajon, CA
Bid Date: Sep 05 2025
El Cajon, CA
Bid Date: Sep 04 2025
El Cajon, CA
Bid Date: Aug 26 2025
El Cajon, CA
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
