Site work for a sidewalk / parking lot in Butler, Ohio. Completed plans call for site work for a sidewalk / parking lot.

Deadline 09/09/2025 02:00 PM EDT. Having carefully reviewed the Instructions to Bidders, Drawings, Specifications and other Contract Documents for the Project including having also received, read, and taken into account the Addenda and likewise having inspected the site and the conditions affecting and governing the Project and confirmed the location of the site utilities and all existing structures, the undersigned hereby proposes to furnish all materials and to perform all labor, as specified and described in the said Specifications and/or as shown on the said Drawings for all Work necessary to complete the Project on a timely basis and in accordance with the Contract Documents regardless of whether expressly provided for in such Specifications and Drawings. Before completing the Bid Form, the undersigned represents that it has carefully reviewed the Legal Notice, Instructions to Bidders, this Bid Form, Form of Bid Guaranty and Contract Bond, Contractor's Affidavit (O.R.C. 5719.042), Owner-Contractor Agreement, General Conditions of the Contract (EJCDC C-700, 2002) (as modified), Drawings, Project Specifications, and other Contract Documents. Failure to comply with provisions of the Contract Documents may be cause for disqualification of the bid. BONDS AND CONTRACT: If the undersigned is notified of bid acceptance, it agrees to furnish required bonds as indicated in the Instructions to Bidders. COMPLETION OF WORK: In submitting a bid, the undersigned agrees to execute the Owner-Contractor Agreement in the form included in the Contract Documents and to complete its Work as required by the Contract Documents. Include the cost of all labor and material necessary to complete the Work described in the Bidding Schedule attached below in accordance with the Contract Document. For alternate items, if applicable, indicate whether the amount stated is in addition to or a deletion from the base bid amount (if there is no indication whether the amount for an alternate is an addition or a deletion, the amount shall be a deduction). If there is difference between the total bid amount and the total of the individual amounts for labor and materials stated under a bid package, the total of the individual amounts shall be the amount deemed to be inserted in the blank for the total labor and materials for each bid package. If there is a difference between a Bid's total unit price for an item, and the product of the items unit price and estimated quantity, then the Bid's total unit price for the respective item shall be deemed the product of the items unit price and estimated quantity. The Bidding Schedule may include a set contingency allowance which will be included as part of the total bid. The person signing for a sole proprietorship must be the sole proprietor or his/her authorized representative. The name of the sole proprietor must be shown below. The person signing for a partnership must be a partner or his/her authorized representative. The person signing for a corporation or a limited liability company must be the president, vice president, managing member or other authorized representative; or he/she must show authority, by affidavit, to bind the corporation or limited liability company. The person signing for some other legal entity must show his/her authority, by affidavit, to bind the legal entity. All work and materials shall conform to the 2019 Ohio Department of Transportation Construction & Material Specifications, including supplemental specifications and standard construction drawings except as modified by the plans and the following project specifications. The City of Hamilton reserves the right to schedule the work to the best interest of the City due to any underground work that may be encountered by any utility. However, scheduling will be done to progress the work by areas, if possible.

Award

Sidewalks / Parking Lot

$99,681.00

Public - City

Site Work

3

3

5

6

Subscribe For Documents

40 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
257
Active Projects
136
Bidding Soon
2,568
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 15, 2025

October 15, 2025

Project location map

Multiple Locations, Butler, OH

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.