BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 19, 2025 at 8:00 PM

Updated September 20, 2025

Renovation of a municipal facility in West Sacramento, California. Completed plans call for the renovation of a municipal facility.

Project Scope NOTE: It is the responsibility of the contractor to apply for a project permit and ensure the project is fully permitted. The contractor is also responsible for updated drawings (as-builts) at the end of the project. The project scope includes the installation of seven (7) water hose bibbs and one (1) sink. At one location (shade structure), minor excavation is required to access the water line under asphalt. The following clarifies the scope and locations (per drawing): Modular 1 - Install hose bibb: Shut off power to the water heater, then shut off water to the modular. Access the cold-water line from underneath the modular and route a new hose bibb through the exterior wall. Turn on the water and check for leaks and functionality. Modular 2 - Install hose bibb: Shut off power to the water heater, then shut off water to the modular. Access the cold-water line from either the bathrooms or underneath the modular and route a new hose bibb through the exterior wall. Turn on the water and check for leaks and functionality. Modular 3 & 4 - Install hose bibbs: Shut off power to the water heater and shut off water to the modular. Access the cold-water line from underneath and route a new hose bibb line approx. 36' to the backside (north) of the modular building. Route another line from the same access point approx. 60' for a hose bibb at the front right corner of modular #4, exterior wall. Turn on the water and check for leaks and functionality. Modular 5 - Install hose bibb: Turn off power to the water heater, then shut off water and drain down the system. Tie into the 1-1/2" copper water line underneath the modular and plumb out for a new hose bibb, including a 1-1/2" ball valve before the hose bibb tie-in, per code requirements. Turn on the water and check for leaks and functionality. Modular 7 - Install hose bibb: Shut off power to the water heater, then shut off water to the modular or facility. Access the cold-water line from underneath and route a new upsized water line and hose bibb through the exterior wall. Turn on the water and check for leaks and functionality. Modular 8 - Install sink and hose bibb: Turn off power to the water heater, shut off water to the modular, and drain down the system. Cut into the 2" copper water main underneath to route a cold-water line for the sink and hose bibb. Cut into the hot water line underneath the modular (bathroom) and route hot water to the sink location. Mount the stainless-steel sink on the south-facing wall, next to the stairs. Route all water and drain lines. Tie the drain line into the existing drain with proper grade underneath the modular. Route the drain vent exposed along the wall, strapped and painted per code requirements. Install hose bibb. Shade Structure - Install hose bibb: Cut a section of asphalt and excavate from the water line to the pole. Install a new tap on the water main and run piping to the existing pole, then install hose bibb. Provide safety material around piping and protrusions to prevent tripping hazards. All work, including backfill and asphalt, shall be code compliant. The contractor shall provide all incidental materials and supplies necessary to complete the work, including but not limited to fasteners, screws, piping, caulking, and safety equipment. Question Deadline 09/05/2025 at 3:30 PM PT: A Proposer may submit Questions related to this RFP to the City through the City s e-Procurement Portal. Question Response Deadline: September 9, 2025, 3:00pm The City reserves the right to accept or reject any and all Bids for a period of sixty (60) days after the date of opening, and to waive any informality or irregularity in any Bid. No Bid can be withdrawn during that period, except pursuant to Public Contract Code section 5102, et seq. 1751480.1 7203-001 The City reserves the right to reject any or all Bids, including, without limitation, the right to reject any non-conforming, non-responsive, or conditional bids. online Bid Opening - Dial in by phone +1 619-485-0116,,244208387# United States, All locations Find a local number Phone conference ID: 244 208 387# For organizers: Meeting options | Reset dial-in PIN

Bid Results

Municipal

$20,227.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

12

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
478
Active Projects
223
Bidding Soon
2,610
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 18, 2025

October 20, 2025

Project location map

4300 W Capitol Ave, West Sacramento, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.