Demolition and site work for a mixed-use development in Costa Mesa, California. Completed plans call for the demolition of a municipal facility; for site work for a water / sewer project; and 5,663-square-foot municipal facility.

The scope of work generally consists of mobilization, complete demolition of a two-story 3,390-square-foot building on a 6,970-square-foot lot, including removal of all above- and below-grade structures, hazardous materials abatement, disconnection and removal of utilities, final grading, and erosion control. The work shall include all labor, equipment, permits, site plans, debris removal, and coordination with utility providers and local authorities, leaving the site clean, level, and ready for future development. Response Types Line Items Subcontractor Bid Bond General Attachment (required) Type of Award Lump Sum. License Requirements Each bidder must have a Class "B" (General Building) and/or Class "C-21" (Building Moving/Demolition) with the respective certification supplements for the required work and also be prequalified as required by law. Liquidated Damages $500 per calendar day. Start/Delivery Date WITHIN (22) WORKING DAYS AFTER DATE OF CONTRACT Project Duration WITHIN SIXTY (60) WORKING DAYS, from the first day of commencement of such work unless legal extension is granted in accordance with the terms set forth in the specifications. Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00%. Question Deadline 09/19/2025 at 2:00 PM PT Online Q&A Yes. The scope of work generally consists of mobilization, complete demolition of a two-story 3,390-square-foot building on a 6,970-square-foot lot, including removal of all above- and below-grade structures, hazardous materials abatement, disconnection and removal of utilities, final grading, and erosion control. The work shall include all labor, equipment, permits, site plans, debris removal, and coordination with utility providers and local authorities, leaving the site clean, level, and ready for future development. It is the bidder's responsibility to ensure that the most current version of the solicitation, including any addenda, has been downloaded. Bids received without the applicable addenda will be rejected as incomplete. Submit one electronic copy of the proposal, pages P1-P12, and the electronic Line Items section, and bid bond as outlined in the Notes Section. All required forms and sections of the Bid must be submitted via online. Bidder is solely responsible for "on time" submission of their electronic bid. The Bid Management System will not accept late bids and no exceptions shall be made. Bidders will receive an e-bid confirmation number with a time stamp from the Bid Management System indicating that their bid was submitted successfully. The City will only receive those bids that were transmitted successfully. ORIGINAL SEALED COPY OF BIDDERS BOND MUST BE SUBMITTED TO THE CITY CLERK, 77 Fair Drive, Costa Mesa, CA, PRIOR TO BID OPENING DATE. All responses for this Bid are due at or before the time shown on each Notice Inviting Bids. Late responses will not be accepted. Hard copy responses of Submittals WILL NOT be accepted. The City is not responsible for and accepts no liability in the event a response is late due to any network, internet, or any other technical problem or interruption. Electronic PDF files of the plans, specifications and bid documents are available. The City is not responsible for any errors that may occur from the printing of any of these documents by bidders, including, but not limited to: scaling issues, print quality, failure to print and submission of all required documents. The Bid Results are immediately available to the public via online following the Bid Opening Date (Bid Due Date). The bidder is solely responsible for "on time" submission of their electronic bid. The City will only consider bids that have been transmitted successfully and have been issued an e-bid confirmation number with a time stamp from the Bid Management System indicating that bid was submitted successfully. Transmission of bids by any other means will not be accepted. Bidder shall be solely responsible for informing itself with respect to the proper utilization of the bid management system, for ensuring the capability of their computer system to upload the required documents, and for the stability of their internet service. Failure of the bidder to successfully submit an electronic bid shall be at the bidder's sole risk and no relief will be given for late and/or improperly submitted bids. Bidders experiencing any technical difficulties with the bid submission process may contact online at (818) 992-1771. Prevailing Wage Compliance Requirement. DIR Registration Requirement.

Award

Municipal

$149,000.00

Public - City

Demolition, Site Work

8

10

7

Subscribe For Documents

73 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
174
Active Projects
3
Bidding Soon
2,268
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 3, 2025

November 3, 2025

Project location map

782 Shalimar Dr, Costa Mesa, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.