BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 25, 2025 at 8:00 PM

Updated September 26, 2025

Site work and paving for a civil project in Union Grove, Wisconsin. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

** As of 09/25/2025 project has been awarded to  Ultimate Backroads, LLC in the amount of $294,537.30.** The proposed construction consists of the extension of 700 LF of 8" sanitary sewer main (198 feet directionally drilled) along the east side of STH 45 (S Colony Ave.) and 575 L.F. of 12" directionally drilled water main that will be installed along the west side of STH 45 (S Colony Ave.), traffic control, surface restoration, and other miscellaneous items of work. Direct all questions about the meaning or intent of the Contract Documents to Engineer (Telephone 815-444-3356 or gvogel@baxterwoodman.com). Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addendum emailed by the Engineer or the Engineer's designated independent distributor, to all parties recorded by Engineer as having received the Bidding Documents. Questions received less than five (5) business days prior to the Bid Opening, might not be answered. Only questions answered by formal written Addendum will be binding. Oral and other interpretations or clarifications will be without legal effect.

Award

Water / Sewer

$294,537.00

Public - City

Paving, Site Work

15

17

6

4

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
475
Active Projects
264
Bidding Soon
3,362
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 11, 2025

October 13, 2025

Project location map

US-45, Union Grove, WI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.