Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 30, 2025 at 8:00 PM
Updated August 31, 2025
Site work and paving for a bridge / tunnel in Cougar, Washington. Working plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
SR 504 Spirit Lake Outlet Br - Emergency Replacement Replacing Bridge #504/107 - Spirit Lake Outlet Br Cost Range 3 - 4M *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Final Planning
Bridges / Tunnels
$4,000,000.00
Public - State/Provincial
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 1, 2025
WA-504, Cougar, WA
Related To This Project
Cougar, WA
Bid Date: Feb 19 2026
Cougar, WA
Bid Date: Aug 14 2023
Cougar, WA
Bid Date: Apr 14 2022
Ridgefield, WA
--
Hamilton, WA
--
Union Gap, WA
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
